Search Results - (( java application optimisation algorithm ) OR ( based contractors method algorithm ))
Search alternatives:
- application optimisation »
- optimisation algorithm »
- contractors method »
- based contractors »
- java application »
- method algorithm »
-
1
Study and Implementation of Data Mining in Urban Gardening
Published 2019“…The system is essentially a three-part development, utilising Android, Java Servlets, and Arduino platforms to create an optimised and automated urban-gardening system. …”
Get full text
Get full text
Get full text
Article -
2
Web-based expert system for material selection of natural fiber- reinforced polymer composites
Published 2015“…Finally, the developed expert system was deployed over the internet with central interactive interface from the server as a web-based application. As Java is platform independent and easy to be deployed in web based application and accessible through the World Wide Web (www), this expert system can be one stop application for materials selection.…”
Get full text
Get full text
Thesis -
3
Government policy as a key moderator to contractors’ risk attitudes among Malaysian construction companies
Published 2020“…This study uses the quantitative method to identify the individual factors influencing contractors’ risk attitude and the moderating role of government policy among construction companies in Malaysia. …”
Get full text
Get full text
Get full text
Get full text
Article -
4
An optimum drill bit selection technique using artificial neural networks and genetic algorithms to increase the rate of penetration
Published 2018“…This paper discusses bit selection by employing a method of combining Artificial Neural Network (ANN) and the computation of Genetic Algorithm (GA). …”
Get full text
Get full text
Article -
5
Real-Time Detection of Personal Protective Equipment for Site Safety Using Deep Learning Techniques
Published 2022“…This paper presents a deep learning technique for detecting multiple personal protection equipment at once based on You-Only-Look-Once Version 4 (YOLOv4) object detection algorithm. …”
Get full text
Get full text
Undergraduates Project Papers -
6
Pile Capacity Checking Tool based on Distributed Fibre Optic Sensing for Instrumented Pile Load Test
Published 2023Get full text
Get full text
Conference or Workshop Item -
7
Influences of Cost Factors Affecting Technical Performance of Local Government Projects in Nigeria: A Partial Least Square-Structural Equation Modeling (PLS-SEM) Approach
Published 2016“…Survey instruments were administered to major stakeholders in the construction industry comprising of project clients, contractors and consultants using proportionate stratified random sampling method. …”
Get full text
Get full text
Get full text
Article -
8
Time-Uncertainty Analysis by Using Simulation in Project Scheduling Networks
Published 1999“…The merge event bias as one of the essential problems associated with PERT is discussed, along with models and approaches developed by other researchers, namely, Probabilistic Network Evaluation Technique (PNET algorithm), Modified PNET, Back-Forward Uncertainly Estimation procedure (BFUE) and concept based on the robust reliability idea. …”
Get full text
Get full text
Thesis
