Search Results - (( its application ((new algorithm) OR (tree algorithm)) ) OR ( job application using algorithm ))*

Refine Results
  1. 1

    Content-based recommender system for an academic social network / Vala Ali Rohani by Vala Ali, Rohani

    Published 2014
    “…The algorithm exploits all interests and preferences in a hierarchy tree structure. …”
    Get full text
    Get full text
    Thesis
  2. 2

    DESIGN AND EVALUATION OF RESOURCE ALLOCATION AND JOB SCHEDULING ALGORITHMS ON COMPUTATIONAL GRIDS by MEHMOOD SHAH, SYED NASIR

    Published 2012
    “…The issue is not only to develop new algorithms, but also to evaluate them on an experimental computational grid, using synthetic and real workload traces, along with the other existing job scheduling algorithms. …”
    Get full text
    Get full text
    Thesis
  3. 3

    Ant colony optimization algorithm for dynamic scheduling of jobs in computational grid by Ku-Mahamud, Ku Ruhana, Ramli, Razamin, Yusof, Yuhanis, Mohamed Din, Aniza, Mahmuddin, Massudi

    Published 2012
    “…Job scheduling problem is classified as an NP-hard problem.Such a problem can be solved only by using approximate algorithms such as heuristic and meta-heuristic algorithms.Among different optimization algorithms for job scheduling, ant colony system algorithm is a popular meta-heuristic algorithm which has the ability to solve different types of NP-hard problems.However, ant colony system algorithm has a deficiency in its heuristic function which affects the algorithm behavior in terms of finding the shortest connection between edges.This research focuses on a new heuristic function where information about recent ants’ discoveries has been considered.The new heuristic function has been integrated into the classical ant colony system algorithm.Furthermore, the enhanced algorithm has been implemented to solve the travelling salesman problem as well as in scheduling of jobs in computational grid.A simulator with dynamic environment feature to mimic real life application has been development to validate the proposed enhanced ant colony system algorithm. …”
    Get full text
    Get full text
    Monograph
  4. 4

    Comparison of path planning in simulated robot by Ch’ng, Chee Yu’ng

    Published 2020
    “…This is because each path planning algorithm has its own applicable domain, performance, advantages and disadvantages in various situations. …”
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9

    Impatient job scheduling under cloud computing by Mahdi, Nawfal A.

    Published 2012
    “…The limitations of those algorithms were addressed and this leads to the proposition of an algorithm that has the ability to map the impatient jobs to virtual machines near its input, output, application, or forth party. …”
    Get full text
    Get full text
    Thesis
  10. 10
  11. 11
  12. 12
  13. 13

    Photogrammetric unmanned aerial vehicle for digital terrain model estimation under oil palm tree canopy area / Suzanah Abdullah by Abdullah, Suzanah

    Published 2021
    “…Following the application of a new methodology on the real site, the result indicated the consistency of DTM values of all the algorithms at different flying heights but there were relatively small differences between all the algorithms used. …”
    Get full text
    Get full text
    Thesis
  14. 14
  15. 15

    Topology-aware hypergraph based approach to optimize scheduling of parallel applications onto distributed parallel architectures by Koohi, Sina Zangbari

    Published 2020
    “…Modelling refers to constructing a model to depict the structure of the application with its tasks and describing the interactions between them. …”
    Get full text
    Get full text
    Thesis
  16. 16
  17. 17
  18. 18
  19. 19
  20. 20

    Cycle time minimization in production line using robust hybrid optimization algorithm by Noorazliza, Sulaiman, Zetty Ain, Kamaruzzaman, Junita, Mohamad Saleh, Ahmad Afif, Ahmarofi

    Published 2021
    “…Cycle time basically means time needed to process a product using a specific task in a production line. This project proposes the application of new hybrid optimization algorithm named JAABC5-RRO to minimize cycle time to produce a new audio product on a production line in a production company.…”
    Get full text
    Get full text
    Conference or Workshop Item