Search Results - (( data application scheduling algorithm ) OR ( variable estimation using algorithm ))

Refine Results
  1. 1

    Processing time estimation in precision machining industry using AI / Lim Say Li by Lim, Say Li

    Published 2017
    “…Neural Network (NN) model is chosen as the artificial intelligence approach used in this research. Levenberg-Marquardt algorithm is used as the training algorithm. …”
    Get full text
    Get full text
    Thesis
  2. 2

    Advanced differential interferometry synthetic aperture radar techniques for deformation monitoring: a review on sensors and recent research development by Idrees, Mohammed Oludare, Saeidi, Vahideh, Pradhan, Biswajeet, Yusuf, Yusuf Ahmed

    Published 2014
    “…Also, current issues in sensor and algorithm development are discussed. The study identified six existing A-DInSAR algorithms used for monitoring various deformation types. …”
    Get full text
    Get full text
    Article
  3. 3

    Robust Data Fusion Techniques Integrated Machine Learning Models For Estimating Reference Evapotranspiration by Chia, Min Yan

    Published 2022
    “…As for the NNE, a novel meta-learner based on the stochastic-enabled extreme learning machine integrated with whale optimisation algorithm (WOA-ELM) was developed and used in such an application for the first time. …”
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  4. 4

    Power management system for smart microgrid considering meteorological and load demand data / Sam Koohikamali by Sam , Koohikamali

    Published 2015
    “…In this case, a power smoothing index (PSI) is formulated, which considers both load and generation, and used to dispatch the battery plant. A droop reference estimator to schedule generation is also introduced where diesel plant can share the local load with grid. …”
    Get full text
    Get full text
    Thesis
  5. 5

    Development of heuristic task scheduling algorithm in cloud computing by Diallo, Laouratou, Hassan Abdalla Hashim, Aisha, Olanrewaju, Rashidah Funke

    Published 2016
    “…To this direction, in this paper we make a summary of some scheduling algorithms and propose an Enhanced Greedy Heuristic Scheduling Algorithm (EGHSA) for task scheduling adapted for big data applications. …”
    Get full text
    Get full text
    Proceeding Paper
  6. 6
  7. 7

    Two objectives big data task scheduling using swarm intelligence in cloud computing by Diallo, Laouratou, Hassan Abdalla Hashim, Aisha, Olanrewaju, Rashidah Funke, Islam, Shayla, Zarir, Abdullah Ahmad

    Published 2016
    “…However, these scheduling algorithms vary in term of their performance and most of these traditional and simple scheduling algorithms may not be efficient for large scale data. …”
    Get full text
    Get full text
    Get full text
    Article
  8. 8

    Simulated annealing algorithm for scheduling divisible load in large scale data grids. by Abdullah, Monir, Othman, Mohamad, Ibrahim, Hamidah, Subramaniam, Shamala

    Published 2009
    “…This paper proposes a novel Simulated Annealing (SA) algorithm for scheduling divisible load in large scale data grids. …”
    Get full text
    Get full text
    Article
  9. 9

    Improved genetic algorithm for scheduling divisible data grid application by Kaid, Monir Abdullah Abduh, Othman, Mohamed, Ibrahim, Hamidah, K. Subramaniam, Shamala

    Published 2007
    “…In this paper, we exploit this property and propose an Improved Genetic Algorithm (IGA) for scheduling divisible data grid applications. …”
    Get full text
    Get full text
    Conference or Workshop Item
  10. 10
  11. 11

    Simulated annealing algorithm for scheduling divisible load in large scale data grids by Abdullah, Monir, Othman, Mohamed, Ibrahim, Hamidah, K. Subramaniam, Shamala

    Published 2008
    “…This paper proposes a novel simulated annealing (SA) algorithm for scheduling divisible load in large scale data grids. …”
    Get full text
    Get full text
    Conference or Workshop Item
  12. 12

    Variable block based motion estimation using hexagon diamond full search algorithm (HDFSA) via block subtraction technique by Hardev Singh, Jitvinder Dev Singh

    Published 2015
    “…The fixed block matching uses the same block size throughout the motion estimation process while the variable block matching uses different block size. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  13. 13
  14. 14
  15. 15

    A novel scheduling algorithm based on game theory and multicriteria decision making in LTE network by Hindia, M.N., Reza, A.W., Noordin, K.A.

    Published 2015
    “…The novel algorithm has proven to be an effective scheduling technique for smart grid applications.…”
    Get full text
    Get full text
    Get full text
    Article
  16. 16
  17. 17

    Survey on job scheduling mechanisms in grid environment by S. M., Argungu, Che Mohamed Arif, Ahmad Suki, Omar, Mohd Hasbullah

    Published 2015
    “…Grid systems provide geographically distributed resources for both computational intensive and data-intensive applications.These applications generate large data sets.However, the high latency imposed by the underlying technologies; upon which the grid system is built (such as the Internet and WWW), induced impediment in the effective access to such huge and widely distributed data.To minimize this impediment, jobs need to be scheduled across grid environments to achieve efficient data access.Scheduling multiple data requests submitted by grid users onto the grid environment is NP-hard.Thus, there is no best scheduling algorithm that cuts across all grids computing environments.Job scheduling is one of the key research area in grid computing.In the recent past many researchers have proposed different mechanisms to help scheduling of user jobs in grid systems.Some characteristic features of the grid components; such as machines types and nature of jobs at hand means that a choice needs to be made for an appropriate scheduling algorithm to march a given grid environment.The aim of scheduling is to achieve maximum possible system throughput and to match the application needs with the available computing resources.This paper is motivated by the need to explore the various job scheduling techniques alongside their area of implementation.The paper will systematically analyze the strengths and weaknesses of some selected approaches in the area of grid jobs scheduling.This helps researchers better understand the concept of scheduling, and can contribute in developing more efficient and practical scheduling algorithms.This will also benefit interested researchers to carry out further work in this dynamic research area.…”
    Get full text
    Get full text
    Get full text
    Article
  18. 18
  19. 19

    Deadline guarantee for scientific workflow using dynamic scheduling algorithms on IaaS clouds by Alqaisy, Sarah Abdulrahman Shukur

    Published 2018
    “…Finally, we expected the scheduling algorithms PDC and DCCP to be improve the Cloud resource usage high efficiency in the IaaS Cloud with efficient scheduling for scientific workflow.…”
    Get full text
    Get full text
    Thesis
  20. 20

    Dynamic replication aware load blanced scheduling in distributed environment / Said Bakhshad by Said Bakhshad, Bakhshad

    Published 2018
    “…Several algorithms have been proposed and studied for scheduling and data replication, however a little research has been done so far on capturing and minimizing the migration rate of data from an existing available replica site to a next site on the basis of data scheduling in order to minimize the transfers and deletion rate. …”
    Get full text
    Get full text
    Get full text
    Thesis