Search Results - (( based evaluation a algorithm ) OR ( based construction risk algorithm ))

Refine Results
  1. 1

    Risk assessment for safety and health algorithm for building construction in Oman by Al-Anbari, Saud Said

    Published 2015
    “…The general objective of this study is to carry out a Risk Assessment for Safety and Health (RASH) algorithm for building construction in Oman and to develop a calculation methodology to evaluate safety and health. …”
    Get full text
    Get full text
    Thesis
  2. 2
  3. 3

    Enhanced Community Detection Based On Cross Time For Higher Visibility In Supply Chain: A Six-Steps Model Framework by Abal Abas, Zuraida, Mohd Zaki, Nurul Hafizah, Asmai, Siti Azirah, Abdul Rahman, Ahmad Fadzli Nizam, Zainal Abidin, Zaheera

    Published 2019
    “…This paper proposed six steps model framework that aim: (1) To construct the nodes and vertices for temporal graph representing the relationship in supply chain network; (2) To propose an enhanced temporal community detection algorithm in graph analytics based on Cross-time approach and (3) To evaluate the enhanced temporal community detection algorithm in graph analytics for representing relationship in supply chain network based on external and internal quality analysis. …”
    Get full text
    Get full text
    Get full text
    Article
  4. 4
  5. 5

    Optimization of medical image steganography using n-decomposition genetic algorithm by Al-Sarayefi, Bushra Abdullah Shtayt

    Published 2023
    “…To overcome these limitations, this study proposes a technique known as an n-decomposition genetic algorithm. …”
    Get full text
    Get full text
    Get full text
    Thesis
  6. 6

    Time-Uncertainty Analysis by Using Simulation in Project Scheduling Networks by Mohammed Omer, Anwar

    Published 1999
    “…In this study, Monte Carlo simulation as a tool of risk analysis was used. The merge event bias as one of the essential problems associated with PERT is discussed, along with models and approaches developed by other researchers, namely, Probabilistic Network Evaluation Technique (PNET algorithm), Modified PNET, Back-Forward Uncertainly Estimation procedure (BFUE) and concept based on the robust reliability idea. …”
    Get full text
    Get full text
    Thesis
  7. 7
  8. 8

    Quantum-Resistant Cryptography in Cyber Security by Bhargavgowda, A.B., Chitra, K.

    Published 2025
    “…It provides a systematic overview of major post-quantum cryptographic families, including lattice-based, hash-based, code-based, multivariate, and isogeny-related schemes, and evaluates their current security assumptions, practical efficiency, and readiness for real-world deployment. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  9. 9

    Evaluation tool of land suitability for medicinal plants by Rahim, Supli Effendi, Supli, Ahmad Affandi, Damiri, Nurhayati, Zaman, Chairil, Husin, Husin

    Published 2019
    “…Planting medicinal crops must be carried out on a land that is suitable based on the results of a land suitability evaluation. …”
    Get full text
    Get full text
    Get full text
    Article
  10. 10
  11. 11

    Reliability assessment of power system generation adequacy with wind power using population-based intelligent search methods by Kadhem, Athraa Ali

    Published 2017
    “…The Monte Carlo simulation (MCS) method enables an accurate evaluation of reliability indices. The drawback of MCS is that it is not suitable for a system with large number of components in a system or high-reliability performance that require large computational effort which would take a long time to converge efficiently. …”
    Get full text
    Get full text
    Get full text
    Thesis
  12. 12

    Digital Surface Model (DSM) Construction and Flood Hazard Simulation for Development Plans in Naga City, Philippines by Abd Rahman, Muhammad Zulkarnain, Dinand, Alkema

    Published 2007
    “…This is supported by the analyses on the community-based flood risk perception and investigation on changes of flood hazard (based on the flood velocity and depth). …”
    Get full text
    Get full text
    Article
  13. 13

    Tourism Sustainable Competitiveness Indicator in Malaysia: Construct and Forecasting Ability by Ann Ni, Soh

    Published 2023
    “…The core framework of the constructed TSCI was selected based on a rigorous variable importance assessment using random forest algorithm. …”
    Get full text
    Get full text
    Get full text
    Thesis
  14. 14

    Government policy as a key moderator to contractors’ risk attitudes among Malaysian construction companies by Taofeeq, D. M., Adeleke, A. Q., Lee, Chia Kuang

    Published 2020
    “…Behaviour is affected by various risk factors and the successful implementation of construction projects depends on effective management of the key risk factors part of which is a personal factor. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  15. 15

    A Hybrid Machine Learning and Optimisation-Based Model for Predicting the Success of Business-To-Consumer Software Development Projects in Indonesia by Setiawan, Rudi

    Published 2025
    “…Building on these findings, a predictive framework is constructed by integrating machine learning algorithms with advanced optimization and data handling strategies. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  16. 16

    Development of a motion planning and obstacle avoidance algorithm using adaptive neuro fuzzy inference system for mobile robot navigation by Muslim, Farah Kamil Abid

    Published 2017
    “…After this, the third objective of the research is planning in a crowded complex situation to evaluate the risk of collision between the robot and the obstacle’s trajectory using a fuzzy logic controller. …”
    Get full text
    Get full text
    Get full text
    Thesis
  17. 17

    Real-time personal protective equipment compliance detection using you only look once by Nurhanisah, Aminuddin, Nor Azuana, Ramli, Pratondo, Agus

    Published 2024
    “…Developing automated systems to detect and identify protective equipment in working sites is not just a technical accomplishment but also a significant step towards improving the workplace, especially in high-risk areas like construction and manufacturing sites. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  18. 18
  19. 19

    Identification and analysis of hoisting safety risk factors for IBS construction based on the AcciMap and cases study by Junjia, Yin, Alias, Aidi Hizami, Haron, Nuzul Azam, Abu Bakar, Nabilah

    Published 2024
    “…By combining Rasmussen's risk framework with the characteristics of hoisting construction, six risk domains and thirty-six safety risk factors were identified. …”
    Get full text
    Get full text
    Get full text
    Article
  20. 20