Systemic process of “on-time delivery” in aerospace composites manufacturing company

There is a lack of systemic resource deployment strategy in producing the right, acceptable quality of wing panel, in the right quantity, complete and delivered on time. Thus, a study was done to examine the systemic impact of the number of labour, output, output accuracy and work-in-process on on-t...

Full description

Saved in:
Bibliographic Details
Main Author: Rozita, Long
Format: Thesis
Language:en
en
Published: 2018
Subjects:
Online Access:https://etd.uum.edu.my/7835/1/Depositpermission_s93542.pdf
https://etd.uum.edu.my/7835/2/s93542_01.pdf
https://etd.uum.edu.my/7835/
https://sierra.uum.edu.my/record=b1698971~S1
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1833436875489017856
author Rozita, Long
author_facet Rozita, Long
author_sort Rozita, Long
building UUM Library
collection Institutional Repository
content_provider Universiti Utara Malaysia
content_source UUM Electronic Theses
continent Asia
country Malaysia
description There is a lack of systemic resource deployment strategy in producing the right, acceptable quality of wing panel, in the right quantity, complete and delivered on time. Thus, a study was done to examine the systemic impact of the number of labour, output, output accuracy and work-in-process on on-time delivery and net sales from a resourcebasedview perspective. The resource-based view theory was the underpinning theory in this study used to explain the implication of resource and capability utilization in an organization. Together with the theory of labour to explain the significance of labour as value creator, the theory of constraints explains the significance of a drum buffer rope concept to create an invisible link that tie up work- in-process at the shop floor and at the same timeidentify the bottleneck in the manufacturing flow to produce theright panel, in the right quantity at the right time. A multivariate statistical analysis tool was applied through a formative-causal relation type of study using a correlational approach. The study revealed that labour has the most significant impact on on-timedelivery compared to output, output accuracy or work-in-process.Research contribution to the theory, organization, industry and academic is truly evident. A documented real objective research concerning aerospace industry hasadded another value to the corpus of knowledge in resource-based view theory, theory of labour and theory of constraint. The research findings created another optionalstrategy for resource and capabilities management in the aerospace manufacturing industry. The study provided a platform for the academic practioners to test their knowledge in a real situational business case. The limitation of this study could inadvertently prove to be an opportunity for further research. Even though the study found that labour was the major contributor to on-time delivery, it did not address how to manage or how to fully utilize labour as the most important resource in the manufacturing sector. This could be another potential area for future research.
format Thesis
id my.uum.etd-7835
institution Universiti Utara Malaysia
language en
en
publishDate 2018
record_format eprints
spelling my.uum.etd-78352021-08-11T06:55:57Z https://etd.uum.edu.my/7835/ Systemic process of “on-time delivery” in aerospace composites manufacturing company Rozita, Long HD28-70 Management. Industrial Management There is a lack of systemic resource deployment strategy in producing the right, acceptable quality of wing panel, in the right quantity, complete and delivered on time. Thus, a study was done to examine the systemic impact of the number of labour, output, output accuracy and work-in-process on on-time delivery and net sales from a resourcebasedview perspective. The resource-based view theory was the underpinning theory in this study used to explain the implication of resource and capability utilization in an organization. Together with the theory of labour to explain the significance of labour as value creator, the theory of constraints explains the significance of a drum buffer rope concept to create an invisible link that tie up work- in-process at the shop floor and at the same timeidentify the bottleneck in the manufacturing flow to produce theright panel, in the right quantity at the right time. A multivariate statistical analysis tool was applied through a formative-causal relation type of study using a correlational approach. The study revealed that labour has the most significant impact on on-timedelivery compared to output, output accuracy or work-in-process.Research contribution to the theory, organization, industry and academic is truly evident. A documented real objective research concerning aerospace industry hasadded another value to the corpus of knowledge in resource-based view theory, theory of labour and theory of constraint. The research findings created another optionalstrategy for resource and capabilities management in the aerospace manufacturing industry. The study provided a platform for the academic practioners to test their knowledge in a real situational business case. The limitation of this study could inadvertently prove to be an opportunity for further research. Even though the study found that labour was the major contributor to on-time delivery, it did not address how to manage or how to fully utilize labour as the most important resource in the manufacturing sector. This could be another potential area for future research. 2018 Thesis NonPeerReviewed text en https://etd.uum.edu.my/7835/1/Depositpermission_s93542.pdf text en https://etd.uum.edu.my/7835/2/s93542_01.pdf Rozita, Long (2018) Systemic process of “on-time delivery” in aerospace composites manufacturing company. PhD. thesis, Universiti Utara Malaysia. https://sierra.uum.edu.my/record=b1698971~S1
spellingShingle HD28-70 Management. Industrial Management
Rozita, Long
Systemic process of “on-time delivery” in aerospace composites manufacturing company
title Systemic process of “on-time delivery” in aerospace composites manufacturing company
title_full Systemic process of “on-time delivery” in aerospace composites manufacturing company
title_fullStr Systemic process of “on-time delivery” in aerospace composites manufacturing company
title_full_unstemmed Systemic process of “on-time delivery” in aerospace composites manufacturing company
title_short Systemic process of “on-time delivery” in aerospace composites manufacturing company
title_sort systemic process of “on-time delivery” in aerospace composites manufacturing company
topic HD28-70 Management. Industrial Management
url https://etd.uum.edu.my/7835/1/Depositpermission_s93542.pdf
https://etd.uum.edu.my/7835/2/s93542_01.pdf
https://etd.uum.edu.my/7835/
https://sierra.uum.edu.my/record=b1698971~S1
url_provider http://etd.uum.edu.my/