Faktor cabaran dan batasan dalam amalan fleksibiliti pembekalan sistem binaan berindustri (IBS)

Flexibility ensures effective implementation of the Industrialised Building System (IBS) supply chain with the demand and changing markets. The main purpose of this research is to identify and also analyze the challenging factors and constraints upon the flexible practises of the IBS supply chain. T...

Full description

Saved in:
Bibliographic Details
Main Author: Umar, Kassim
Format: Thesis
Language:en
en
Published: 2015
Subjects:
Online Access:https://etd.uum.edu.my/5400/1/s93577.pdf
https://etd.uum.edu.my/5400/2/s93577_abstract.pdf
https://etd.uum.edu.my/5400/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1833436514771533824
author Umar, Kassim
author_facet Umar, Kassim
author_sort Umar, Kassim
building UUM Library
collection Institutional Repository
content_provider Universiti Utara Malaysia
content_source UUM Electronic Theses
continent Asia
country Malaysia
description Flexibility ensures effective implementation of the Industrialised Building System (IBS) supply chain with the demand and changing markets. The main purpose of this research is to identify and also analyze the challenging factors and constraints upon the flexible practises of the IBS supply chain. Thus, this research measures the importance of connection and coordination among the related parties in the supply chain cycle. Besides, the factors on misconception and also lack of awareness about the supply chain practises are also being studied along with the analysis of the affecting challenging factors and constraints upon the flexible implementation of IBS supply chain. Furthermore, thorough analysis is made regarding the challenging factors and other supply chain flexibility that prevent the continuity and development of the Industrialised Building System (IBS) in Malaysia. Issues and problems in IBS supply chain flexibility arise due to the flaws in the facility management (that are capital funding and transportation), information problems, resource and inventory, and also communication and integration within the building team itself. It creates future problems such as repetitive works, work delays, costs increment, poor communications, standardizations and wastage. The research uses both empirical analyses of quantitative and qualitative orientations. About 70 developers and contractors are taken as respondents for this research. A few statistical techniques are used in the data analysis, which are reliability test, descriptive,frequency, and also several other techniques. The capability of organization is a significant factor to ensure the effectiveness of the implementation of IBS practises. Independent variable holds influence (27.7%) on the IBS system. However, the capability of the organization is the most significant factor on the IBS system with b=0.054, t=0.331, p<0.01. Based on the analysis outcomes, the developers only choose IBS after they realize and understand the benefits and effectiveness of IBS practises. A model of IBS supply chain is also developed. Any IBS related problems can be solved through the establishment of impeccable and efficient flexibility supply chain. This research is hoped to be the precursor to further work in enhancing performances of industrial development of IBS Malaysia towards a better and outstanding level
format Thesis
id my.uum.etd-5400
institution Universiti Utara Malaysia
language en
en
publishDate 2015
record_format eprints
spelling my.uum.etd-54002021-03-18T08:48:16Z https://etd.uum.edu.my/5400/ Faktor cabaran dan batasan dalam amalan fleksibiliti pembekalan sistem binaan berindustri (IBS) Umar, Kassim TH Building construction Flexibility ensures effective implementation of the Industrialised Building System (IBS) supply chain with the demand and changing markets. The main purpose of this research is to identify and also analyze the challenging factors and constraints upon the flexible practises of the IBS supply chain. Thus, this research measures the importance of connection and coordination among the related parties in the supply chain cycle. Besides, the factors on misconception and also lack of awareness about the supply chain practises are also being studied along with the analysis of the affecting challenging factors and constraints upon the flexible implementation of IBS supply chain. Furthermore, thorough analysis is made regarding the challenging factors and other supply chain flexibility that prevent the continuity and development of the Industrialised Building System (IBS) in Malaysia. Issues and problems in IBS supply chain flexibility arise due to the flaws in the facility management (that are capital funding and transportation), information problems, resource and inventory, and also communication and integration within the building team itself. It creates future problems such as repetitive works, work delays, costs increment, poor communications, standardizations and wastage. The research uses both empirical analyses of quantitative and qualitative orientations. About 70 developers and contractors are taken as respondents for this research. A few statistical techniques are used in the data analysis, which are reliability test, descriptive,frequency, and also several other techniques. The capability of organization is a significant factor to ensure the effectiveness of the implementation of IBS practises. Independent variable holds influence (27.7%) on the IBS system. However, the capability of the organization is the most significant factor on the IBS system with b=0.054, t=0.331, p<0.01. Based on the analysis outcomes, the developers only choose IBS after they realize and understand the benefits and effectiveness of IBS practises. A model of IBS supply chain is also developed. Any IBS related problems can be solved through the establishment of impeccable and efficient flexibility supply chain. This research is hoped to be the precursor to further work in enhancing performances of industrial development of IBS Malaysia towards a better and outstanding level 2015 Thesis NonPeerReviewed text en https://etd.uum.edu.my/5400/1/s93577.pdf text en https://etd.uum.edu.my/5400/2/s93577_abstract.pdf Umar, Kassim (2015) Faktor cabaran dan batasan dalam amalan fleksibiliti pembekalan sistem binaan berindustri (IBS). PhD. thesis, Universiti Utara Malaysia.
spellingShingle TH Building construction
Umar, Kassim
Faktor cabaran dan batasan dalam amalan fleksibiliti pembekalan sistem binaan berindustri (IBS)
title Faktor cabaran dan batasan dalam amalan fleksibiliti pembekalan sistem binaan berindustri (IBS)
title_full Faktor cabaran dan batasan dalam amalan fleksibiliti pembekalan sistem binaan berindustri (IBS)
title_fullStr Faktor cabaran dan batasan dalam amalan fleksibiliti pembekalan sistem binaan berindustri (IBS)
title_full_unstemmed Faktor cabaran dan batasan dalam amalan fleksibiliti pembekalan sistem binaan berindustri (IBS)
title_short Faktor cabaran dan batasan dalam amalan fleksibiliti pembekalan sistem binaan berindustri (IBS)
title_sort faktor cabaran dan batasan dalam amalan fleksibiliti pembekalan sistem binaan berindustri (ibs)
topic TH Building construction
url https://etd.uum.edu.my/5400/1/s93577.pdf
https://etd.uum.edu.my/5400/2/s93577_abstract.pdf
https://etd.uum.edu.my/5400/
url_provider http://etd.uum.edu.my/