Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes

Production is one of the issues that are continuously being monitored. Thus, a case study is being done on the productivity of the production end of a factory that produces sieved sugar as its final product. This research is mainly to study the level of productivity in the production end of Kilang...

Full description

Saved in:
Bibliographic Details
Main Author: Rosshairy, Abd. Rahman
Format: Thesis
Language:en
en
Published: 2003
Subjects:
Online Access:https://etd.uum.edu.my/1210/1/ROSSHAIRY_BT._ABD._RAHMAN.pdf
https://etd.uum.edu.my/1210/2/1.ROSSHAIRY_BT._ABD._RAHMAN.pdf
https://etd.uum.edu.my/1210/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1833435602671894528
author Rosshairy, Abd. Rahman
author_facet Rosshairy, Abd. Rahman
author_sort Rosshairy, Abd. Rahman
building UUM Library
collection Institutional Repository
content_provider Universiti Utara Malaysia
content_source UUM Electronic Theses
continent Asia
country Malaysia
description Production is one of the issues that are continuously being monitored. Thus, a case study is being done on the productivity of the production end of a factory that produces sieved sugar as its final product. This research is mainly to study the level of productivity in the production end of Kilang Gula FELDA Perlis. Since there was no previous study done, partial and multifactor productivity are used in determining a suitable index for measuring productivity level on the production end of KGFP. Multifactor productivity has been determined as a suitable measuring index for productivity level at KGFP. Shift productivity and work group are also being analyzed using three-month worth of data that begins on January 2002 and ends on March 2002. This study has shown that workers on the afternoon shift from 3.00pm to 11.OOpm have the highest productivity yield. However, the difference in productivity value between the three shifts is very small. As for shift groups, group A has shown the highest productivity level followed by group C and B respectively. Next, regression analysis is done to determine the factor that relates to the productivity. Result from this analysis has shown that raw material and salary gives a significant value towards the output.
format Thesis
id my.uum.etd-1210
institution Universiti Utara Malaysia
language en
en
publishDate 2003
record_format eprints
spelling my.uum.etd-12102013-07-24T12:10:56Z https://etd.uum.edu.my/1210/ Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes Rosshairy, Abd. Rahman HD56-57.5 Industrial Productivity Production is one of the issues that are continuously being monitored. Thus, a case study is being done on the productivity of the production end of a factory that produces sieved sugar as its final product. This research is mainly to study the level of productivity in the production end of Kilang Gula FELDA Perlis. Since there was no previous study done, partial and multifactor productivity are used in determining a suitable index for measuring productivity level on the production end of KGFP. Multifactor productivity has been determined as a suitable measuring index for productivity level at KGFP. Shift productivity and work group are also being analyzed using three-month worth of data that begins on January 2002 and ends on March 2002. This study has shown that workers on the afternoon shift from 3.00pm to 11.OOpm have the highest productivity yield. However, the difference in productivity value between the three shifts is very small. As for shift groups, group A has shown the highest productivity level followed by group C and B respectively. Next, regression analysis is done to determine the factor that relates to the productivity. Result from this analysis has shown that raw material and salary gives a significant value towards the output. 2003-08-10 Thesis NonPeerReviewed application/pdf en https://etd.uum.edu.my/1210/1/ROSSHAIRY_BT._ABD._RAHMAN.pdf application/pdf en https://etd.uum.edu.my/1210/2/1.ROSSHAIRY_BT._ABD._RAHMAN.pdf Rosshairy, Abd. Rahman (2003) Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes. Masters thesis, Universiti Utara Malaysia.
spellingShingle HD56-57.5 Industrial Productivity
Rosshairy, Abd. Rahman
Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes
title Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes
title_full Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes
title_fullStr Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes
title_full_unstemmed Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes
title_short Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes
title_sort produktiviti di bahagian pengeluaran sebuah kilang : satu kajian kes
topic HD56-57.5 Industrial Productivity
url https://etd.uum.edu.my/1210/1/ROSSHAIRY_BT._ABD._RAHMAN.pdf
https://etd.uum.edu.my/1210/2/1.ROSSHAIRY_BT._ABD._RAHMAN.pdf
https://etd.uum.edu.my/1210/
url_provider http://etd.uum.edu.my/