Management System for KLiAB

Kuala Lumpur International Airport (KLlA) is one of the mega project currently under construction in Malaysia. KLiA project that is designed and will be equipped with the most modern airport facilities; has to be compl~ted within a period of three years for the design and construction processes. The...

Full description

Saved in:
Bibliographic Details
Main Author: Mohammed, Abdul Hakim
Format: Article
Language:en
Published: Fakulti Kejuruteraan & Sains Geoinformasi, Universiti Teknologi Malaysia. 1998
Subjects:
Online Access:http://eprints.utm.my/4952/1/management.pdf
http://eprints.utm.my/4952/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1845471254991077376
author Mohammed, Abdul Hakim
author_facet Mohammed, Abdul Hakim
author_sort Mohammed, Abdul Hakim
building UTM Library
collection Institutional Repository
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
continent Asia
country Malaysia
description Kuala Lumpur International Airport (KLlA) is one of the mega project currently under construction in Malaysia. KLiA project that is designed and will be equipped with the most modern airport facilities; has to be compl~ted within a period of three years for the design and construction processes. The Malaysian Government has appointed Kuala Lumpur International Airport Berhad (KLlAB) as a project management consultant. With the time constraint and the complexity of the project; KL1AB has created its Quality Management System (OMS) to ensure that the project can be completed as required. The OMS could be described as the organizational sfructure, responsibilities, procedures, processes and resources for implementing quality management. In the case of KLiA project, the OMS is well documented in the Quality Management Procedures Manual. The OMS procedures describe techniques, methods and plans that control the planning, design and construction processes to ensure the achievement of quality requirements. Despite the full commitment of the KLiAB management, some of the contractors and the consultants do not appreciate the importance of the OMS.
format Article
id my.utm.eprints-4952
institution Universiti Teknologi Malaysia
language en
publishDate 1998
publisher Fakulti Kejuruteraan & Sains Geoinformasi, Universiti Teknologi Malaysia.
record_format eprints
spelling my.utm.eprints-49522010-06-01T03:22:13Z http://eprints.utm.my/4952/ Management System for KLiAB Mohammed, Abdul Hakim H Social Sciences (General) Kuala Lumpur International Airport (KLlA) is one of the mega project currently under construction in Malaysia. KLiA project that is designed and will be equipped with the most modern airport facilities; has to be compl~ted within a period of three years for the design and construction processes. The Malaysian Government has appointed Kuala Lumpur International Airport Berhad (KLlAB) as a project management consultant. With the time constraint and the complexity of the project; KL1AB has created its Quality Management System (OMS) to ensure that the project can be completed as required. The OMS could be described as the organizational sfructure, responsibilities, procedures, processes and resources for implementing quality management. In the case of KLiA project, the OMS is well documented in the Quality Management Procedures Manual. The OMS procedures describe techniques, methods and plans that control the planning, design and construction processes to ensure the achievement of quality requirements. Despite the full commitment of the KLiAB management, some of the contractors and the consultants do not appreciate the importance of the OMS. Fakulti Kejuruteraan & Sains Geoinformasi, Universiti Teknologi Malaysia. 1998-12 Article PeerReviewed application/pdf en http://eprints.utm.my/4952/1/management.pdf Mohammed, Abdul Hakim (1998) Management System for KLiAB. Buletin Geoinformasi, 2 (2). pp. 305-310. ISSN 1394-7702
spellingShingle H Social Sciences (General)
Mohammed, Abdul Hakim
Management System for KLiAB
title Management System for KLiAB
title_full Management System for KLiAB
title_fullStr Management System for KLiAB
title_full_unstemmed Management System for KLiAB
title_short Management System for KLiAB
title_sort management system for kliab
topic H Social Sciences (General)
url http://eprints.utm.my/4952/1/management.pdf
http://eprints.utm.my/4952/
url_provider http://eprints.utm.my/