Data-base: harga bahan dan buruh binaan

Labour are the most important cost element in a construction project. However, the labor prices are not fixed in market. There are variation of price that can be offered by the contractor and sub-contractor. The price are different based on factors such as skill, types of project, location of projec...

Full description

Saved in:
Bibliographic Details
Main Authors: Khalid, Abd. Ghani, Abdul Hamid, Razali, Mohd. Yusof, Zakaria, Misnan, Mohd. Saidin
Format: Monograph
Language:en
Published: Faculty of Built Engineering 2006
Subjects:
Online Access:http://eprints.utm.my/3966/1/68852.pdf
http://eprints.utm.my/3966/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1845471006528897024
author Khalid, Abd. Ghani
Abdul Hamid, Razali
Mohd. Yusof, Zakaria
Misnan, Mohd. Saidin
author_facet Khalid, Abd. Ghani
Abdul Hamid, Razali
Mohd. Yusof, Zakaria
Misnan, Mohd. Saidin
author_sort Khalid, Abd. Ghani
building UTM Library
collection Institutional Repository
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
continent Asia
country Malaysia
description Labour are the most important cost element in a construction project. However, the labor prices are not fixed in market. There are variation of price that can be offered by the contractor and sub-contractor. The price are different based on factors such as skill, types of project, location of project, demand and supply of labour, level of life, citizen, gender and races. For that reason, this study was carrying out to identify and compare the labour price in range and average aspect according to location and tred and also the factors which are influence it. The study scope only focuses in Terengganu, Johor and Kuala Lumpur. Research methodology that has been used for this study is questionnaire forms. The respondents are contractor and sub-contractor. From the findings, Kuala Lumpur is the location which offered the highest labour price which is RM90.00 compare with Terengganu and Johor. The treds which offered with high price by the all location are carpenter and joiner, plant operator, fitter, pneumatic tool operator, blasting operator and piling rigger. The result from analysis shown that the most influence factors for the variation of labour price are skill and location of project. While, races is the one factor which is almost not influence the variation of labour price.
format Monograph
id my.utm.eprints-3966
institution Universiti Teknologi Malaysia
language en
publishDate 2006
publisher Faculty of Built Engineering
record_format eprints
spelling my.utm.eprints-39662017-08-06T08:43:02Z http://eprints.utm.my/3966/ Data-base: harga bahan dan buruh binaan Khalid, Abd. Ghani Abdul Hamid, Razali Mohd. Yusof, Zakaria Misnan, Mohd. Saidin TH Building construction Labour are the most important cost element in a construction project. However, the labor prices are not fixed in market. There are variation of price that can be offered by the contractor and sub-contractor. The price are different based on factors such as skill, types of project, location of project, demand and supply of labour, level of life, citizen, gender and races. For that reason, this study was carrying out to identify and compare the labour price in range and average aspect according to location and tred and also the factors which are influence it. The study scope only focuses in Terengganu, Johor and Kuala Lumpur. Research methodology that has been used for this study is questionnaire forms. The respondents are contractor and sub-contractor. From the findings, Kuala Lumpur is the location which offered the highest labour price which is RM90.00 compare with Terengganu and Johor. The treds which offered with high price by the all location are carpenter and joiner, plant operator, fitter, pneumatic tool operator, blasting operator and piling rigger. The result from analysis shown that the most influence factors for the variation of labour price are skill and location of project. While, races is the one factor which is almost not influence the variation of labour price. Faculty of Built Engineering 2006-08-30 Monograph NonPeerReviewed application/pdf en http://eprints.utm.my/3966/1/68852.pdf Khalid, Abd. Ghani and Abdul Hamid, Razali and Mohd. Yusof, Zakaria and Misnan, Mohd. Saidin (2006) Data-base: harga bahan dan buruh binaan. Project Report. Faculty of Built Engineering, Skudai, Johor. (Unpublished)
spellingShingle TH Building construction
Khalid, Abd. Ghani
Abdul Hamid, Razali
Mohd. Yusof, Zakaria
Misnan, Mohd. Saidin
Data-base: harga bahan dan buruh binaan
title Data-base: harga bahan dan buruh binaan
title_full Data-base: harga bahan dan buruh binaan
title_fullStr Data-base: harga bahan dan buruh binaan
title_full_unstemmed Data-base: harga bahan dan buruh binaan
title_short Data-base: harga bahan dan buruh binaan
title_sort data-base: harga bahan dan buruh binaan
topic TH Building construction
url http://eprints.utm.my/3966/1/68852.pdf
http://eprints.utm.my/3966/
url_provider http://eprints.utm.my/