Determining the basic principles in managing project schedule for construction.

The application of the scheduling software has been quite popular in Malaysia recently. Planning software like Microsoft Project and Primavera had been used to develop the schedule for construction project for the purpose or project monitoring and control. Many clients organization have made the tas...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohammad, Mohammad Ibrahim, Abdullah, Arham
Format: Monograph
Language:en
Published: Universiti Teknologi Malaysia 2005
Subjects:
Online Access:http://eprints.utm.my/2749/1/75189.pdf
http://eprints.utm.my/2749/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1845470746843807744
author Mohammad, Mohammad Ibrahim
Abdullah, Arham
author_facet Mohammad, Mohammad Ibrahim
Abdullah, Arham
author_sort Mohammad, Mohammad Ibrahim
building UTM Library
collection Institutional Repository
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
continent Asia
country Malaysia
description The application of the scheduling software has been quite popular in Malaysia recently. Planning software like Microsoft Project and Primavera had been used to develop the schedule for construction project for the purpose or project monitoring and control. Many clients organization have made the task to submit computer generated schedule as mandatory. However in real practice the schedule submitted has not been very useful for the client. In some instances the schedule has been ignored once submitted to the client. There are many problems associated to this situation. Among them is due to the absent of the standard guideline that can be used to manage the schedule itself. The contractor. Contractor has been prepared the schedule based on their own assumption and without much consideration for actual application for the project later. Therefore this short term research has been conducted with the main aim to develop such guideline. The methodology adopted for the study includes the interviews with panel of professional in construction and questionnaire survey. The development of the guideline is based on the feedback by the respondents of the questionnaires survey conducted. Prior to that, the research has also investigated the current state of arts of the scheduling practice in Malaysia and its limitation. The major finding of the research is the development of the guideline for managing the scheduling process. This guideline can be used by the major client to regulate the process of preparing, submission and updating the project progress. It is expected that this schedule can be improve further by improving its level of comprehensiveness.
format Monograph
id my.utm.eprints-2749
institution Universiti Teknologi Malaysia
language en
publishDate 2005
publisher Universiti Teknologi Malaysia
record_format eprints
spelling my.utm.eprints-27492012-06-08T01:51:48Z http://eprints.utm.my/2749/ Determining the basic principles in managing project schedule for construction. Mohammad, Mohammad Ibrahim Abdullah, Arham TH Building construction TA Engineering (General). Civil engineering (General) The application of the scheduling software has been quite popular in Malaysia recently. Planning software like Microsoft Project and Primavera had been used to develop the schedule for construction project for the purpose or project monitoring and control. Many clients organization have made the task to submit computer generated schedule as mandatory. However in real practice the schedule submitted has not been very useful for the client. In some instances the schedule has been ignored once submitted to the client. There are many problems associated to this situation. Among them is due to the absent of the standard guideline that can be used to manage the schedule itself. The contractor. Contractor has been prepared the schedule based on their own assumption and without much consideration for actual application for the project later. Therefore this short term research has been conducted with the main aim to develop such guideline. The methodology adopted for the study includes the interviews with panel of professional in construction and questionnaire survey. The development of the guideline is based on the feedback by the respondents of the questionnaires survey conducted. Prior to that, the research has also investigated the current state of arts of the scheduling practice in Malaysia and its limitation. The major finding of the research is the development of the guideline for managing the scheduling process. This guideline can be used by the major client to regulate the process of preparing, submission and updating the project progress. It is expected that this schedule can be improve further by improving its level of comprehensiveness. Universiti Teknologi Malaysia 2005-12-31 Monograph NonPeerReviewed application/pdf en http://eprints.utm.my/2749/1/75189.pdf Mohammad, Mohammad Ibrahim and Abdullah, Arham (2005) Determining the basic principles in managing project schedule for construction. Project Report. Universiti Teknologi Malaysia. (Unpublished)
spellingShingle TH Building construction
TA Engineering (General). Civil engineering (General)
Mohammad, Mohammad Ibrahim
Abdullah, Arham
Determining the basic principles in managing project schedule for construction.
title Determining the basic principles in managing project schedule for construction.
title_full Determining the basic principles in managing project schedule for construction.
title_fullStr Determining the basic principles in managing project schedule for construction.
title_full_unstemmed Determining the basic principles in managing project schedule for construction.
title_short Determining the basic principles in managing project schedule for construction.
title_sort determining the basic principles in managing project schedule for construction.
topic TH Building construction
TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/2749/1/75189.pdf
http://eprints.utm.my/2749/
url_provider http://eprints.utm.my/