Feasibility study on replacement of steel signboard post with prestressed concrete post

The main aim of this feasibility study was to evaluate the performance of prestressed concrete post due to replacing steel material in designing signboard posts for expressway in Malaysia. The scope of the study was mainly on mild steel with a diameter of 406 mm circular hollow section, which is the...

Full description

Saved in:
Bibliographic Details
Main Authors: Awang, Abdullah Zawawi, Rais, Ahmad Zaidon, Abd. Hamid, Hazlan, Yassin, Mohamad Salleh
Format: Monograph
Language:en
Published: Universiti Teknologi Malaysia 2002
Subjects:
Online Access:http://eprints.utm.my/2681/1/71690.pdf
http://eprints.utm.my/2681/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1845470728986558464
author Awang, Abdullah Zawawi
Rais, Ahmad Zaidon
Abd. Hamid, Hazlan
Yassin, Mohamad Salleh
author_facet Awang, Abdullah Zawawi
Rais, Ahmad Zaidon
Abd. Hamid, Hazlan
Yassin, Mohamad Salleh
author_sort Awang, Abdullah Zawawi
building UTM Library
collection Institutional Repository
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
continent Asia
country Malaysia
description The main aim of this feasibility study was to evaluate the performance of prestressed concrete post due to replacing steel material in designing signboard posts for expressway in Malaysia. The scope of the study was mainly on mild steel with a diameter of 406 mm circular hollow section, which is the biggest size that has been used by PLUS Bhd. Some comparisons were made based on earlier studies in evaluating the performance of both materials in construction and service stages. The performance of both materials in many aspects was investigated; they were safety, strength, workability, durability and serviceability aspects. The prestressed concrete was found has a good potential to be used as a standard signboard post for expressway in Malaysia in future. It has a good performance and some advantages which are not found in steel posts. By using prestressed concrete post, a dependency of the construction industry to steel material supply can be solved and consequently the overall cost of the signboard construction can be reduced.
format Monograph
id my.utm.eprints-2681
institution Universiti Teknologi Malaysia
language en
publishDate 2002
publisher Universiti Teknologi Malaysia
record_format eprints
spelling my.utm.eprints-26812017-10-11T01:28:13Z http://eprints.utm.my/2681/ Feasibility study on replacement of steel signboard post with prestressed concrete post Awang, Abdullah Zawawi Rais, Ahmad Zaidon Abd. Hamid, Hazlan Yassin, Mohamad Salleh TE Highway engineering. Roads and pavements TF Railroad engineering and operation TA Engineering (General). Civil engineering (General) The main aim of this feasibility study was to evaluate the performance of prestressed concrete post due to replacing steel material in designing signboard posts for expressway in Malaysia. The scope of the study was mainly on mild steel with a diameter of 406 mm circular hollow section, which is the biggest size that has been used by PLUS Bhd. Some comparisons were made based on earlier studies in evaluating the performance of both materials in construction and service stages. The performance of both materials in many aspects was investigated; they were safety, strength, workability, durability and serviceability aspects. The prestressed concrete was found has a good potential to be used as a standard signboard post for expressway in Malaysia in future. It has a good performance and some advantages which are not found in steel posts. By using prestressed concrete post, a dependency of the construction industry to steel material supply can be solved and consequently the overall cost of the signboard construction can be reduced. Universiti Teknologi Malaysia 2002-12-31 Monograph NonPeerReviewed application/pdf en http://eprints.utm.my/2681/1/71690.pdf Awang, Abdullah Zawawi and Rais, Ahmad Zaidon and Abd. Hamid, Hazlan and Yassin, Mohamad Salleh (2002) Feasibility study on replacement of steel signboard post with prestressed concrete post. Project Report. Universiti Teknologi Malaysia. (Unpublished)
spellingShingle TE Highway engineering. Roads and pavements
TF Railroad engineering and operation
TA Engineering (General). Civil engineering (General)
Awang, Abdullah Zawawi
Rais, Ahmad Zaidon
Abd. Hamid, Hazlan
Yassin, Mohamad Salleh
Feasibility study on replacement of steel signboard post with prestressed concrete post
title Feasibility study on replacement of steel signboard post with prestressed concrete post
title_full Feasibility study on replacement of steel signboard post with prestressed concrete post
title_fullStr Feasibility study on replacement of steel signboard post with prestressed concrete post
title_full_unstemmed Feasibility study on replacement of steel signboard post with prestressed concrete post
title_short Feasibility study on replacement of steel signboard post with prestressed concrete post
title_sort feasibility study on replacement of steel signboard post with prestressed concrete post
topic TE Highway engineering. Roads and pavements
TF Railroad engineering and operation
TA Engineering (General). Civil engineering (General)
url http://eprints.utm.my/2681/1/71690.pdf
http://eprints.utm.my/2681/
url_provider http://eprints.utm.my/