Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach
Urban cities grown in population day by day, proportionally to the electricity demand. The existence of the right of ways and the decreasing of land space to build new overhead transmission line towers, other criterion had to be observed. Other than upgrading towers, re-conductoring can be pursued i...
Saved in:
| Main Authors: | , , , , |
|---|---|
| Format: | Article |
| Language: | en |
| Published: |
Asian Research Publishing Network (ARPN)
2015
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/5639/1/AJ%202015%20%2811%29.pdf http://eprints.uthm.edu.my/5639/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1833417903249031168 |
|---|---|
| author | Baharom, Md Nor Ramdon Mahmod, Luqman Hakim Zainal, Zainab Ullah, Irshad Ali, Irfan |
| author_facet | Baharom, Md Nor Ramdon Mahmod, Luqman Hakim Zainal, Zainab Ullah, Irshad Ali, Irfan |
| author_sort | Baharom, Md Nor Ramdon |
| building | UTHM Library |
| collection | Institutional Repository |
| content_provider | Universiti Tun Hussein Onn Malaysia |
| content_source | UTHM Institutional Repository |
| continent | Asia |
| country | Malaysia |
| description | Urban cities grown in population day by day, proportionally to the electricity demand. The existence of the right of ways and the decreasing of land space to build new overhead transmission line towers, other criterion had to be observed. Other than upgrading towers, re-conductoring can be pursued if it does not violates the right of ways in any aspect. This project compares available conductors in the market to determine which will provide better performance in terms of current and sag for 275 kV lattice tower. |
| format | Article |
| id | my.uthm.eprints-5639 |
| institution | Universiti Tun Hussein Onn Malaysia |
| language | en |
| publishDate | 2015 |
| publisher | Asian Research Publishing Network (ARPN) |
| record_format | eprints |
| spelling | my.uthm.eprints-56392022-01-19T07:15:47Z http://eprints.uthm.edu.my/5639/ Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach Baharom, Md Nor Ramdon Mahmod, Luqman Hakim Zainal, Zainab Ullah, Irshad Ali, Irfan T Technology (General) Urban cities grown in population day by day, proportionally to the electricity demand. The existence of the right of ways and the decreasing of land space to build new overhead transmission line towers, other criterion had to be observed. Other than upgrading towers, re-conductoring can be pursued if it does not violates the right of ways in any aspect. This project compares available conductors in the market to determine which will provide better performance in terms of current and sag for 275 kV lattice tower. Asian Research Publishing Network (ARPN) 2015 Article PeerReviewed text en http://eprints.uthm.edu.my/5639/1/AJ%202015%20%2811%29.pdf Baharom, Md Nor Ramdon and Mahmod, Luqman Hakim and Zainal, Zainab and Ullah, Irshad and Ali, Irfan (2015) Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach. ARPN Journal of Engineering and Applied Sciences, 10 (19). pp. 8547-8555. ISSN 1819-6608 |
| spellingShingle | T Technology (General) Baharom, Md Nor Ramdon Mahmod, Luqman Hakim Zainal, Zainab Ullah, Irshad Ali, Irfan Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach |
| title | Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach |
| title_full | Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach |
| title_fullStr | Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach |
| title_full_unstemmed | Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach |
| title_short | Improvement of the SAG ampacity carrying level of existing 275 KV overhead line tower by using the re-conductoring approach |
| title_sort | improvement of the sag ampacity carrying level of existing 275 kv overhead line tower by using the re-conductoring approach |
| topic | T Technology (General) |
| url | http://eprints.uthm.edu.my/5639/1/AJ%202015%20%2811%29.pdf http://eprints.uthm.edu.my/5639/ |
| url_provider | http://eprints.uthm.edu.my/ |