A theoretical framework on factors causing delay of construction industries projects

Time is one of the main important elements which should be taken into consideration during implementation of construction industry projects and project management life cycle as a whole and can be considered as one of the most significant parameters of a project and the main critical factor that dete...

Full description

Saved in:
Bibliographic Details
Main Authors: Ahmed Al-Fadhali, Najib Mohammed, Zainal, Rozlin
Format: Article
Language:en
Published: Medwell Jommls 2017
Subjects:
Online Access:http://eprints.uthm.edu.my/4583/1/AJ%202017%20%28202%29%20A%20theoretical%20framework%20on%20factors%20causing%20delay.pdf
http://eprints.uthm.edu.my/4583/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1833417636955815936
author Ahmed Al-Fadhali, Najib Mohammed
Zainal, Rozlin
author_facet Ahmed Al-Fadhali, Najib Mohammed
Zainal, Rozlin
author_sort Ahmed Al-Fadhali, Najib Mohammed
building UTHM Library
collection Institutional Repository
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
continent Asia
country Malaysia
description Time is one of the main important elements which should be taken into consideration during implementation of construction industry projects and project management life cycle as a whole and can be considered as one of the most significant parameters of a project and the main critical factor that determines the success of the project. The objective of this study is to propose the theoretical framework that causes construction projects delay in Yemen. The causes of delay were collected from the prior intemational jownal papers. Time delay is a very recurrent phenomenon and is nearly associated with almost all constructing projects. However, little effort has been made to amputate the phenomenon. Delay can be defined as time overnm or expansion of time to accomplish the project. Construction delay cannot be avoided especially in government facilities in Yemen. Therefore, delay is a case when the actual work of a construction project is slower than the planned schedule or late accomplishment of the projects. The review of literature in relation to causes of delay in construction projects can be summarized llllder 3 main headings namely: delay caused by contractor, delay caused by acts of God and delay caused by consultant. These 3 variables form the framework upon which this review is based.
format Article
id my.uthm.eprints-4583
institution Universiti Tun Hussein Onn Malaysia
language en
publishDate 2017
publisher Medwell Jommls
record_format eprints
spelling my.uthm.eprints-45832021-12-07T07:59:05Z http://eprints.uthm.edu.my/4583/ A theoretical framework on factors causing delay of construction industries projects Ahmed Al-Fadhali, Najib Mohammed Zainal, Rozlin TA Engineering (General). Civil engineering (General) TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction Time is one of the main important elements which should be taken into consideration during implementation of construction industry projects and project management life cycle as a whole and can be considered as one of the most significant parameters of a project and the main critical factor that determines the success of the project. The objective of this study is to propose the theoretical framework that causes construction projects delay in Yemen. The causes of delay were collected from the prior intemational jownal papers. Time delay is a very recurrent phenomenon and is nearly associated with almost all constructing projects. However, little effort has been made to amputate the phenomenon. Delay can be defined as time overnm or expansion of time to accomplish the project. Construction delay cannot be avoided especially in government facilities in Yemen. Therefore, delay is a case when the actual work of a construction project is slower than the planned schedule or late accomplishment of the projects. The review of literature in relation to causes of delay in construction projects can be summarized llllder 3 main headings namely: delay caused by contractor, delay caused by acts of God and delay caused by consultant. These 3 variables form the framework upon which this review is based. Medwell Jommls 2017 Article PeerReviewed text en http://eprints.uthm.edu.my/4583/1/AJ%202017%20%28202%29%20A%20theoretical%20framework%20on%20factors%20causing%20delay.pdf Ahmed Al-Fadhali, Najib Mohammed and Zainal, Rozlin (2017) A theoretical framework on factors causing delay of construction industries projects. The Social Sciences, 12 (3). pp. 393-399. ISSN 1818-5800
spellingShingle TA Engineering (General). Civil engineering (General)
TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
Ahmed Al-Fadhali, Najib Mohammed
Zainal, Rozlin
A theoretical framework on factors causing delay of construction industries projects
title A theoretical framework on factors causing delay of construction industries projects
title_full A theoretical framework on factors causing delay of construction industries projects
title_fullStr A theoretical framework on factors causing delay of construction industries projects
title_full_unstemmed A theoretical framework on factors causing delay of construction industries projects
title_short A theoretical framework on factors causing delay of construction industries projects
title_sort theoretical framework on factors causing delay of construction industries projects
topic TA Engineering (General). Civil engineering (General)
TH1000-1725 Systems of building construction. Including fireproof construction, concrete construction
url http://eprints.uthm.edu.my/4583/1/AJ%202017%20%28202%29%20A%20theoretical%20framework%20on%20factors%20causing%20delay.pdf
http://eprints.uthm.edu.my/4583/
url_provider http://eprints.uthm.edu.my/