Performance testing of a proposed design energy installation system for vehicle’s wind turbine

The present study considered the performance analysis of a new proposed design of a vehicle’s wind turbine energy installation system. A test is conducted on the energy conversion and storage system that have been built to evaluate its performance and the capability. The result shows that the power...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohd, Sofian, Rosly, Nurhayati, Basuno, Bambang, Mohd Fikri, Mohd Masrom, Abdul Ghafir, Mohammad Fahmi
Format: Article
Language:en
Published: IOP Publishing 2019
Subjects:
Online Access:http://eprints.uthm.edu.my/4403/1/AJ%202019%20%28269%29.pdf
http://eprints.uthm.edu.my/4403/
https://dx.doi.org/ 10.1088/1742-6596/1150/1/012056
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1833417590132703232
author Mohd, Sofian
Rosly, Nurhayati
Basuno, Bambang
Mohd Fikri, Mohd Masrom
Abdul Ghafir, Mohammad Fahmi
author_facet Mohd, Sofian
Rosly, Nurhayati
Basuno, Bambang
Mohd Fikri, Mohd Masrom
Abdul Ghafir, Mohammad Fahmi
author_sort Mohd, Sofian
building UTHM Library
collection Institutional Repository
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
continent Asia
country Malaysia
description The present study considered the performance analysis of a new proposed design of a vehicle’s wind turbine energy installation system. A test is conducted on the energy conversion and storage system that have been built to evaluate its performance and the capability. The result shows that the power that is generated by the system is directly proportional to the speed of the alternator. The time taken for charging a battery is also recorded and it is found that it takes about 2 to 3 hours to fill the 12-volt battery depending on the size and capacity of the battery used. The power generated for the system is 20.4 watt and 120.5 watt at 60 km/h and 120 km/h respectively. From the analysis that has been done, the energy from a turbine has the potential to generate power to car system. The wind energy is possible to integrate with other existing and renewable energy.
format Article
id my.uthm.eprints-4403
institution Universiti Tun Hussein Onn Malaysia
language en
publishDate 2019
publisher IOP Publishing
record_format eprints
spelling my.uthm.eprints-44032021-12-02T07:10:58Z http://eprints.uthm.edu.my/4403/ Performance testing of a proposed design energy installation system for vehicle’s wind turbine Mohd, Sofian Rosly, Nurhayati Basuno, Bambang Mohd Fikri, Mohd Masrom Abdul Ghafir, Mohammad Fahmi TJ266-267.5 Turbines. Turbomachines (General) The present study considered the performance analysis of a new proposed design of a vehicle’s wind turbine energy installation system. A test is conducted on the energy conversion and storage system that have been built to evaluate its performance and the capability. The result shows that the power that is generated by the system is directly proportional to the speed of the alternator. The time taken for charging a battery is also recorded and it is found that it takes about 2 to 3 hours to fill the 12-volt battery depending on the size and capacity of the battery used. The power generated for the system is 20.4 watt and 120.5 watt at 60 km/h and 120 km/h respectively. From the analysis that has been done, the energy from a turbine has the potential to generate power to car system. The wind energy is possible to integrate with other existing and renewable energy. IOP Publishing 2019 Article PeerReviewed text en http://eprints.uthm.edu.my/4403/1/AJ%202019%20%28269%29.pdf Mohd, Sofian and Rosly, Nurhayati and Basuno, Bambang and Mohd Fikri, Mohd Masrom and Abdul Ghafir, Mohammad Fahmi (2019) Performance testing of a proposed design energy installation system for vehicle’s wind turbine. Journal of Physics: Conference Series, 1150. pp. 1-9. ISSN 1742-6588 https://dx.doi.org/ 10.1088/1742-6596/1150/1/012056
spellingShingle TJ266-267.5 Turbines. Turbomachines (General)
Mohd, Sofian
Rosly, Nurhayati
Basuno, Bambang
Mohd Fikri, Mohd Masrom
Abdul Ghafir, Mohammad Fahmi
Performance testing of a proposed design energy installation system for vehicle’s wind turbine
title Performance testing of a proposed design energy installation system for vehicle’s wind turbine
title_full Performance testing of a proposed design energy installation system for vehicle’s wind turbine
title_fullStr Performance testing of a proposed design energy installation system for vehicle’s wind turbine
title_full_unstemmed Performance testing of a proposed design energy installation system for vehicle’s wind turbine
title_short Performance testing of a proposed design energy installation system for vehicle’s wind turbine
title_sort performance testing of a proposed design energy installation system for vehicle’s wind turbine
topic TJ266-267.5 Turbines. Turbomachines (General)
url http://eprints.uthm.edu.my/4403/1/AJ%202019%20%28269%29.pdf
http://eprints.uthm.edu.my/4403/
https://dx.doi.org/ 10.1088/1742-6596/1150/1/012056
url_provider http://eprints.uthm.edu.my/