Causative factors of construction and demolition waste generation in Iraq Construction Industry

The construction industry has hurt the environment from the waste generated during construction activities. Thus, it calls for serious measures to determine the causative factors of construction waste generated. There are limited studies on factors causing construction, and demolition (C&D...

Full description

Saved in:
Bibliographic Details
Main Author: Obaid, Maytham Kadhim
Format: Thesis
Language:en
en
en
Published: 2021
Subjects:
Online Access:http://eprints.uthm.edu.my/4004/1/24p%20MAYTHAM%20KADHIM%20OBAID.pdf
http://eprints.uthm.edu.my/4004/2/MAYTHAM%20KADHIM%20OBAID%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/4004/3/MAYTHAM%20KADHIM%20OBAID%20WATERMARK.pdf
http://eprints.uthm.edu.my/4004/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1833417484724600832
author Obaid, Maytham Kadhim
author_facet Obaid, Maytham Kadhim
author_sort Obaid, Maytham Kadhim
building UTHM Library
collection Institutional Repository
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
continent Asia
country Malaysia
description The construction industry has hurt the environment from the waste generated during construction activities. Thus, it calls for serious measures to determine the causative factors of construction waste generated. There are limited studies on factors causing construction, and demolition (C&D) waste generation, and these limited studies only focused on the quantification of construction waste. This study took the opportunity to identify the causative factors for the C&D waste generation and also to determine the risk level of each causal factor, and the most important minimization methods to avoiding generating waste. This study was carried out based on the quantitative approach. A total of 39 factors that causes construction waste generation that has been identified from the literature review were considered which were then clustered into 4 groups. Improved questionnaire surveys by 38 construction experts (consultants, contractors and clients) during the pilot study. The actual survey was conducted with a total of 380 questionnaires, received with a response rate of 83.3%. Data analysis was performed using SPSS software. Ranking analysis using the mean score approach found the five most significant causative factors which are poor site management, poor planning, lack of experience, rework and poor controlling. The result also indicated that the majority of the identified factors having a high-risk level, in addition, the better minimization method is environmental awareness. A structural model was developed based on the 4 groups of causative factors using the Partial Least Squared-Structural Equation Modelling (PLS-SEM) technique. It was found that the model fits due to the goodness of fit (GOF ≥ 0.36= 0.658, substantial). Based on the outcome of this study, 39 factors were relevant to the generation of construction and demolition waste in Iraq. These groups of factors should be avoided during construction works to reduce the waste generated. The findings of this study are helpful to authorities and stakeholders in formulating laws and regulations. Furthermore, it provides opportunities for future researchers to conduct additional research’s on the factors that contribute to construction waste generation.
format Thesis
id my.uthm.eprints-4004
institution Universiti Tun Hussein Onn Malaysia
language en
en
en
publishDate 2021
record_format eprints
spelling my.uthm.eprints-40042022-02-03T02:19:41Z http://eprints.uthm.edu.my/4004/ Causative factors of construction and demolition waste generation in Iraq Construction Industry Obaid, Maytham Kadhim TH6014-6081 Environmental engineering of buildings. Sanitary engineering of buildings The construction industry has hurt the environment from the waste generated during construction activities. Thus, it calls for serious measures to determine the causative factors of construction waste generated. There are limited studies on factors causing construction, and demolition (C&D) waste generation, and these limited studies only focused on the quantification of construction waste. This study took the opportunity to identify the causative factors for the C&D waste generation and also to determine the risk level of each causal factor, and the most important minimization methods to avoiding generating waste. This study was carried out based on the quantitative approach. A total of 39 factors that causes construction waste generation that has been identified from the literature review were considered which were then clustered into 4 groups. Improved questionnaire surveys by 38 construction experts (consultants, contractors and clients) during the pilot study. The actual survey was conducted with a total of 380 questionnaires, received with a response rate of 83.3%. Data analysis was performed using SPSS software. Ranking analysis using the mean score approach found the five most significant causative factors which are poor site management, poor planning, lack of experience, rework and poor controlling. The result also indicated that the majority of the identified factors having a high-risk level, in addition, the better minimization method is environmental awareness. A structural model was developed based on the 4 groups of causative factors using the Partial Least Squared-Structural Equation Modelling (PLS-SEM) technique. It was found that the model fits due to the goodness of fit (GOF ≥ 0.36= 0.658, substantial). Based on the outcome of this study, 39 factors were relevant to the generation of construction and demolition waste in Iraq. These groups of factors should be avoided during construction works to reduce the waste generated. The findings of this study are helpful to authorities and stakeholders in formulating laws and regulations. Furthermore, it provides opportunities for future researchers to conduct additional research’s on the factors that contribute to construction waste generation. 2021-10 Thesis NonPeerReviewed text en http://eprints.uthm.edu.my/4004/1/24p%20MAYTHAM%20KADHIM%20OBAID.pdf text en http://eprints.uthm.edu.my/4004/2/MAYTHAM%20KADHIM%20OBAID%20COPYRIGHT%20DECLARATION.pdf text en http://eprints.uthm.edu.my/4004/3/MAYTHAM%20KADHIM%20OBAID%20WATERMARK.pdf Obaid, Maytham Kadhim (2021) Causative factors of construction and demolition waste generation in Iraq Construction Industry. Doctoral thesis, Universiti Tun Hussein Onn Malaysia.
spellingShingle TH6014-6081 Environmental engineering of buildings. Sanitary engineering of buildings
Obaid, Maytham Kadhim
Causative factors of construction and demolition waste generation in Iraq Construction Industry
title Causative factors of construction and demolition waste generation in Iraq Construction Industry
title_full Causative factors of construction and demolition waste generation in Iraq Construction Industry
title_fullStr Causative factors of construction and demolition waste generation in Iraq Construction Industry
title_full_unstemmed Causative factors of construction and demolition waste generation in Iraq Construction Industry
title_short Causative factors of construction and demolition waste generation in Iraq Construction Industry
title_sort causative factors of construction and demolition waste generation in iraq construction industry
topic TH6014-6081 Environmental engineering of buildings. Sanitary engineering of buildings
url http://eprints.uthm.edu.my/4004/1/24p%20MAYTHAM%20KADHIM%20OBAID.pdf
http://eprints.uthm.edu.my/4004/2/MAYTHAM%20KADHIM%20OBAID%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/4004/3/MAYTHAM%20KADHIM%20OBAID%20WATERMARK.pdf
http://eprints.uthm.edu.my/4004/
url_provider http://eprints.uthm.edu.my/