Schedule based material requirements planning: a case study of LCD TV manufacturer

The tools used by management to achieve its initial objectives is Production Planning and Control (PPC). PPC is used to propose the basic issues of utilization of its resources, inventory management and its low productivity. This is because the production system consists of four factors – quality, q...

Full description

Saved in:
Bibliographic Details
Main Authors: Cheam, Kai Wen, Mohd Nor, Norasmiha, Shahkirin, Ahmad Haiqal, Jaafar, Muhamad Zamakhsyari, Mhd Zamaludin, Nabilah Afrina, Misnan, Nur Aini Nasihah
Format: Book Section
Language:en
Published: Penerbit UTHM 2020
Subjects:
Online Access:http://eprints.uthm.edu.my/3205/1/Ch01.pdf
http://eprints.uthm.edu.my/3205/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1833417278960435200
author Cheam, Kai Wen
Mohd Nor, Norasmiha
Shahkirin, Ahmad Haiqal
Jaafar, Muhamad Zamakhsyari
Mhd Zamaludin, Nabilah Afrina
Misnan, Nur Aini Nasihah
author2 Mohd Nor, Norasmiha
author_facet Mohd Nor, Norasmiha
Cheam, Kai Wen
Mohd Nor, Norasmiha
Shahkirin, Ahmad Haiqal
Jaafar, Muhamad Zamakhsyari
Mhd Zamaludin, Nabilah Afrina
Misnan, Nur Aini Nasihah
author_sort Cheam, Kai Wen
building UTHM Library
collection Institutional Repository
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
continent Asia
country Malaysia
description The tools used by management to achieve its initial objectives is Production Planning and Control (PPC). PPC is used to propose the basic issues of utilization of its resources, inventory management and its low productivity. This is because the production system consists of four factors – quality, quantity, time and cost (Wikner J. O., 2000).
format Book Section
id my.uthm.eprints-3205
institution Universiti Tun Hussein Onn Malaysia
language en
publishDate 2020
publisher Penerbit UTHM
record_format eprints
spelling my.uthm.eprints-32052022-01-04T04:06:07Z http://eprints.uthm.edu.my/3205/ Schedule based material requirements planning: a case study of LCD TV manufacturer Cheam, Kai Wen Mohd Nor, Norasmiha Shahkirin, Ahmad Haiqal Jaafar, Muhamad Zamakhsyari Mhd Zamaludin, Nabilah Afrina Misnan, Nur Aini Nasihah TS155-194 Production management. Operations management The tools used by management to achieve its initial objectives is Production Planning and Control (PPC). PPC is used to propose the basic issues of utilization of its resources, inventory management and its low productivity. This is because the production system consists of four factors – quality, quantity, time and cost (Wikner J. O., 2000). Penerbit UTHM Mohd Nor, Norasmiha Cheam, Kai Wen 2020 Book Section PeerReviewed text en http://eprints.uthm.edu.my/3205/1/Ch01.pdf Cheam, Kai Wen and Mohd Nor, Norasmiha and Shahkirin, Ahmad Haiqal and Jaafar, Muhamad Zamakhsyari and Mhd Zamaludin, Nabilah Afrina and Misnan, Nur Aini Nasihah (2020) Schedule based material requirements planning: a case study of LCD TV manufacturer. In: Material Requirements Planning. Penerbit UTHM, pp. 1-23. ISBN 978-967-2916-53-6
spellingShingle TS155-194 Production management. Operations management
Cheam, Kai Wen
Mohd Nor, Norasmiha
Shahkirin, Ahmad Haiqal
Jaafar, Muhamad Zamakhsyari
Mhd Zamaludin, Nabilah Afrina
Misnan, Nur Aini Nasihah
Schedule based material requirements planning: a case study of LCD TV manufacturer
title Schedule based material requirements planning: a case study of LCD TV manufacturer
title_full Schedule based material requirements planning: a case study of LCD TV manufacturer
title_fullStr Schedule based material requirements planning: a case study of LCD TV manufacturer
title_full_unstemmed Schedule based material requirements planning: a case study of LCD TV manufacturer
title_short Schedule based material requirements planning: a case study of LCD TV manufacturer
title_sort schedule based material requirements planning: a case study of lcd tv manufacturer
topic TS155-194 Production management. Operations management
url http://eprints.uthm.edu.my/3205/1/Ch01.pdf
http://eprints.uthm.edu.my/3205/
url_provider http://eprints.uthm.edu.my/