CONTRACTOR’S PERCEPTION TO CONTRIBUTING FACTORS, EFFECTS AND MITIGATION MEASURES OF DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA

Saved in:
Bibliographic Details
Main Author: YAP, WAN HEONG
Format: Thesis
Language:en
en
en
Published: 2024
Subjects:
Online Access:http://eprints.uthm.edu.my/12650/1/YAP%20WAN%20HEONG%2024p.pdf
http://eprints.uthm.edu.my/12650/2/Declaration.pdf
http://eprints.uthm.edu.my/12650/3/YAP%20WAN%20HEONG%20full.pdf
http://eprints.uthm.edu.my/12650/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1834509280427900928
author YAP, WAN HEONG
author_facet YAP, WAN HEONG
author_sort YAP, WAN HEONG
building UTHM Library
collection Institutional Repository
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
continent Asia
country Malaysia
format Thesis
id my.uthm.eprints-12650
institution Universiti Tun Hussein Onn Malaysia
language en
en
en
publishDate 2024
record_format eprints
spelling my.uthm.eprints-126502025-05-30T07:52:39Z http://eprints.uthm.edu.my/12650/ CONTRACTOR’S PERCEPTION TO CONTRIBUTING FACTORS, EFFECTS AND MITIGATION MEASURES OF DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA YAP, WAN HEONG TA190-194 Management of engineering works 2024-07 Thesis NonPeerReviewed text en http://eprints.uthm.edu.my/12650/1/YAP%20WAN%20HEONG%2024p.pdf text en http://eprints.uthm.edu.my/12650/2/Declaration.pdf text en http://eprints.uthm.edu.my/12650/3/YAP%20WAN%20HEONG%20full.pdf YAP, WAN HEONG (2024) CONTRACTOR’S PERCEPTION TO CONTRIBUTING FACTORS, EFFECTS AND MITIGATION MEASURES OF DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA. Masters thesis, Universiti Tun Hussein Onn.
spellingShingle TA190-194 Management of engineering works
YAP, WAN HEONG
CONTRACTOR’S PERCEPTION TO CONTRIBUTING FACTORS, EFFECTS AND MITIGATION MEASURES OF DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA
title CONTRACTOR’S PERCEPTION TO CONTRIBUTING FACTORS, EFFECTS AND MITIGATION MEASURES OF DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA
title_full CONTRACTOR’S PERCEPTION TO CONTRIBUTING FACTORS, EFFECTS AND MITIGATION MEASURES OF DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA
title_fullStr CONTRACTOR’S PERCEPTION TO CONTRIBUTING FACTORS, EFFECTS AND MITIGATION MEASURES OF DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA
title_full_unstemmed CONTRACTOR’S PERCEPTION TO CONTRIBUTING FACTORS, EFFECTS AND MITIGATION MEASURES OF DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA
title_short CONTRACTOR’S PERCEPTION TO CONTRIBUTING FACTORS, EFFECTS AND MITIGATION MEASURES OF DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA
title_sort contractor’s perception to contributing factors, effects and mitigation measures of delays in megaproject in peninsular malaysia
topic TA190-194 Management of engineering works
url http://eprints.uthm.edu.my/12650/1/YAP%20WAN%20HEONG%2024p.pdf
http://eprints.uthm.edu.my/12650/2/Declaration.pdf
http://eprints.uthm.edu.my/12650/3/YAP%20WAN%20HEONG%20full.pdf
http://eprints.uthm.edu.my/12650/
url_provider http://eprints.uthm.edu.my/