CONTRACTOR’S PERCEPTION TO CONTRIBUTING FACTORS, EFFECTS AND MITIGATION MEASURES OF DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | en en en |
| Published: |
2024
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/12650/1/YAP%20WAN%20HEONG%2024p.pdf http://eprints.uthm.edu.my/12650/2/Declaration.pdf http://eprints.uthm.edu.my/12650/3/YAP%20WAN%20HEONG%20full.pdf http://eprints.uthm.edu.my/12650/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1834509280427900928 |
|---|---|
| author | YAP, WAN HEONG |
| author_facet | YAP, WAN HEONG |
| author_sort | YAP, WAN HEONG |
| building | UTHM Library |
| collection | Institutional Repository |
| content_provider | Universiti Tun Hussein Onn Malaysia |
| content_source | UTHM Institutional Repository |
| continent | Asia |
| country | Malaysia |
| format | Thesis |
| id | my.uthm.eprints-12650 |
| institution | Universiti Tun Hussein Onn Malaysia |
| language | en en en |
| publishDate | 2024 |
| record_format | eprints |
| spelling | my.uthm.eprints-126502025-05-30T07:52:39Z http://eprints.uthm.edu.my/12650/ CONTRACTOR’S PERCEPTION TO CONTRIBUTING FACTORS, EFFECTS AND MITIGATION MEASURES OF DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA YAP, WAN HEONG TA190-194 Management of engineering works 2024-07 Thesis NonPeerReviewed text en http://eprints.uthm.edu.my/12650/1/YAP%20WAN%20HEONG%2024p.pdf text en http://eprints.uthm.edu.my/12650/2/Declaration.pdf text en http://eprints.uthm.edu.my/12650/3/YAP%20WAN%20HEONG%20full.pdf YAP, WAN HEONG (2024) CONTRACTOR’S PERCEPTION TO CONTRIBUTING FACTORS, EFFECTS AND MITIGATION MEASURES OF DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA. Masters thesis, Universiti Tun Hussein Onn. |
| spellingShingle | TA190-194 Management of engineering works YAP, WAN HEONG CONTRACTOR’S PERCEPTION TO CONTRIBUTING FACTORS, EFFECTS AND MITIGATION MEASURES OF DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA |
| title | CONTRACTOR’S PERCEPTION TO CONTRIBUTING
FACTORS, EFFECTS AND MITIGATION MEASURES OF
DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA |
| title_full | CONTRACTOR’S PERCEPTION TO CONTRIBUTING
FACTORS, EFFECTS AND MITIGATION MEASURES OF
DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA |
| title_fullStr | CONTRACTOR’S PERCEPTION TO CONTRIBUTING
FACTORS, EFFECTS AND MITIGATION MEASURES OF
DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA |
| title_full_unstemmed | CONTRACTOR’S PERCEPTION TO CONTRIBUTING
FACTORS, EFFECTS AND MITIGATION MEASURES OF
DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA |
| title_short | CONTRACTOR’S PERCEPTION TO CONTRIBUTING
FACTORS, EFFECTS AND MITIGATION MEASURES OF
DELAYS IN MEGAPROJECT IN PENINSULAR MALAYSIA |
| title_sort | contractor’s perception to contributing
factors, effects and mitigation measures of
delays in megaproject in peninsular malaysia |
| topic | TA190-194 Management of engineering works |
| url | http://eprints.uthm.edu.my/12650/1/YAP%20WAN%20HEONG%2024p.pdf http://eprints.uthm.edu.my/12650/2/Declaration.pdf http://eprints.uthm.edu.my/12650/3/YAP%20WAN%20HEONG%20full.pdf http://eprints.uthm.edu.my/12650/ |
| url_provider | http://eprints.uthm.edu.my/ |
