Interface Management for Telecommunication System During Design Stage: A Case Study of LRT3 Project

Managing the design interfaces of railway projects is challenging and time-consuming due to many complex and inter-dependent interfaces that are embedded within numerous subsystems and work packages. Based on the preliminary study with 2 Interface Managers involved in LRT3 project, it has been foun...

Full description

Saved in:
Bibliographic Details
Main Authors: Soon Ern, Peniel Ang, Nordin, Norimran, Saparudin, Faiz Asraf, Kai Len, Tsai, Kasim, Narimah, Osman, Mohamad Hairi
Format: Article
Language:en
Published: Aip Publishing 2024
Subjects:
Online Access:http://eprints.uthm.edu.my/12411/1/J17879_38327a3c2f4905d78c772abd58a6b791.pdf
http://eprints.uthm.edu.my/12411/
https://doi.org/10.1063/5.0199315
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1833419787975262208
author Soon Ern, Peniel Ang
Nordin, Norimran
Saparudin, Faiz Asraf
Kai Len, Tsai
Kasim, Narimah
Osman, Mohamad Hairi
author_facet Soon Ern, Peniel Ang
Nordin, Norimran
Saparudin, Faiz Asraf
Kai Len, Tsai
Kasim, Narimah
Osman, Mohamad Hairi
author_sort Soon Ern, Peniel Ang
building UTHM Library
collection Institutional Repository
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
continent Asia
country Malaysia
description Managing the design interfaces of railway projects is challenging and time-consuming due to many complex and inter-dependent interfaces that are embedded within numerous subsystems and work packages. Based on the preliminary study with 2 Interface Managers involved in LRT3 project, it has been found that many interface issues occurred during the design stage due to various reasons. Hence, a case study on the LRT3 project was conducted to propose ways to improve the Interface Management (IM) in LRT3. A semi-structured interview with the IM personnel in LRT3 project was conducted and the IM documentation and tools for the LRT 3 project were reviewed to explore the IM issues and investigate the main factors causing the IM issues during the design stage of LRT3 Project. Subsequently, a practical assessment of the IM framework in the LRT3 Project relating Telecommunication system was conducted where the shortcomings were highlighted and the main IM issues and the factors causing these issues were unfolded. Finally, based on the findings received, a few recommendations were made on how to improve IM in LRT3 project. This research may address the common concerns of project stakeholders with respect to interface management in railway projects and highlights the importance of having an effective IM framework to avoid project delays and conflicts between the interfacing parties.
format Article
id my.uthm.eprints-12411
institution Universiti Tun Hussein Onn Malaysia
language en
publishDate 2024
publisher Aip Publishing
record_format eprints
spelling my.uthm.eprints-124112025-02-20T01:47:14Z http://eprints.uthm.edu.my/12411/ Interface Management for Telecommunication System During Design Stage: A Case Study of LRT3 Project Soon Ern, Peniel Ang Nordin, Norimran Saparudin, Faiz Asraf Kai Len, Tsai Kasim, Narimah Osman, Mohamad Hairi HE Transportation and Communications Managing the design interfaces of railway projects is challenging and time-consuming due to many complex and inter-dependent interfaces that are embedded within numerous subsystems and work packages. Based on the preliminary study with 2 Interface Managers involved in LRT3 project, it has been found that many interface issues occurred during the design stage due to various reasons. Hence, a case study on the LRT3 project was conducted to propose ways to improve the Interface Management (IM) in LRT3. A semi-structured interview with the IM personnel in LRT3 project was conducted and the IM documentation and tools for the LRT 3 project were reviewed to explore the IM issues and investigate the main factors causing the IM issues during the design stage of LRT3 Project. Subsequently, a practical assessment of the IM framework in the LRT3 Project relating Telecommunication system was conducted where the shortcomings were highlighted and the main IM issues and the factors causing these issues were unfolded. Finally, based on the findings received, a few recommendations were made on how to improve IM in LRT3 project. This research may address the common concerns of project stakeholders with respect to interface management in railway projects and highlights the importance of having an effective IM framework to avoid project delays and conflicts between the interfacing parties. Aip Publishing 2024 Article PeerReviewed text en http://eprints.uthm.edu.my/12411/1/J17879_38327a3c2f4905d78c772abd58a6b791.pdf Soon Ern, Peniel Ang and Nordin, Norimran and Saparudin, Faiz Asraf and Kai Len, Tsai and Kasim, Narimah and Osman, Mohamad Hairi (2024) Interface Management for Telecommunication System During Design Stage: A Case Study of LRT3 Project. Proceedings of the International Conference on Green Engineering & Technology. pp. 1-10. https://doi.org/10.1063/5.0199315
spellingShingle HE Transportation and Communications
Soon Ern, Peniel Ang
Nordin, Norimran
Saparudin, Faiz Asraf
Kai Len, Tsai
Kasim, Narimah
Osman, Mohamad Hairi
Interface Management for Telecommunication System During Design Stage: A Case Study of LRT3 Project
title Interface Management for Telecommunication System During Design Stage: A Case Study of LRT3 Project
title_full Interface Management for Telecommunication System During Design Stage: A Case Study of LRT3 Project
title_fullStr Interface Management for Telecommunication System During Design Stage: A Case Study of LRT3 Project
title_full_unstemmed Interface Management for Telecommunication System During Design Stage: A Case Study of LRT3 Project
title_short Interface Management for Telecommunication System During Design Stage: A Case Study of LRT3 Project
title_sort interface management for telecommunication system during design stage: a case study of lrt3 project
topic HE Transportation and Communications
url http://eprints.uthm.edu.my/12411/1/J17879_38327a3c2f4905d78c772abd58a6b791.pdf
http://eprints.uthm.edu.my/12411/
https://doi.org/10.1063/5.0199315
url_provider http://eprints.uthm.edu.my/