Interface management for telecommunication system during design stage: a case study of LRT3 project
Managing the design interfaces of railway projects is challenging and time-consuming due to many complex and inter-dependent interfaces that are embedded within numerous subsystems and work packages. Based on the preliminary study with 2 Interface Managers involved in LRT3 project, it has been fou...
Saved in:
| Main Authors: | , , , , , |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | en |
| Published: |
2024
|
| Subjects: | |
| Online Access: | http://eprints.uthm.edu.my/11854/1/J17879_38327a3c2f4905d78c772abd58a6b791.pdf%209.pdf http://eprints.uthm.edu.my/11854/ https://doi.org/10.1063/5.0199315 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1833419638141091840 |
|---|---|
| author | Peniel, Ang Soon Ern Nordin, Norimran Saparudin, Faiz Asraf Tsai, Kai Len Kasim, Narimah Osman, Mohamad Hairi |
| author_facet | Peniel, Ang Soon Ern Nordin, Norimran Saparudin, Faiz Asraf Tsai, Kai Len Kasim, Narimah Osman, Mohamad Hairi |
| author_sort | Peniel, Ang Soon Ern |
| building | UTHM Library |
| collection | Institutional Repository |
| content_provider | Universiti Tun Hussein Onn Malaysia |
| content_source | UTHM Institutional Repository |
| continent | Asia |
| country | Malaysia |
| description | Managing the design interfaces of railway projects is challenging and time-consuming due to many complex and
inter-dependent interfaces that are embedded within numerous subsystems and work packages. Based on the preliminary
study with 2 Interface Managers involved in LRT3 project, it has been found that many interface issues occurred during
the design stage due to various reasons. Hence, a case study on the LRT3 project was conducted to propose ways to improve
the Interface Management (IM) in LRT3. A semi-structured interview with the IM personnel in LRT3 project was
conducted and the IM documentation and tools for the LRT 3 project were reviewed to explore the IM issues and investigate
the main factors causing the IM issues during the design stage of LRT3 Project. Subsequently, a practical assessment of
the IM framework in the LRT3 Project relating Telecommunication system was conducted where the shortcomings were
highlighted and the main IM issues and the factors causing these issues were unfolded. Finally, based on the findings
received, a few recommendations were made on how to improve IM in LRT3 project. This research may address the
common concerns of project stakeholders with respect to interface management in railway projects and highlights the
importance of having an effective IM framework to avoid project delays and conflicts between the interfacing parties |
| format | Conference or Workshop Item |
| id | my.uthm.eprints-11854 |
| institution | Universiti Tun Hussein Onn Malaysia |
| language | en |
| publishDate | 2024 |
| record_format | eprints |
| spelling | my.uthm.eprints-118542025-04-10T03:57:51Z http://eprints.uthm.edu.my/11854/ Interface management for telecommunication system during design stage: a case study of LRT3 project Peniel, Ang Soon Ern Nordin, Norimran Saparudin, Faiz Asraf Tsai, Kai Len Kasim, Narimah Osman, Mohamad Hairi T Technology (General) Managing the design interfaces of railway projects is challenging and time-consuming due to many complex and inter-dependent interfaces that are embedded within numerous subsystems and work packages. Based on the preliminary study with 2 Interface Managers involved in LRT3 project, it has been found that many interface issues occurred during the design stage due to various reasons. Hence, a case study on the LRT3 project was conducted to propose ways to improve the Interface Management (IM) in LRT3. A semi-structured interview with the IM personnel in LRT3 project was conducted and the IM documentation and tools for the LRT 3 project were reviewed to explore the IM issues and investigate the main factors causing the IM issues during the design stage of LRT3 Project. Subsequently, a practical assessment of the IM framework in the LRT3 Project relating Telecommunication system was conducted where the shortcomings were highlighted and the main IM issues and the factors causing these issues were unfolded. Finally, based on the findings received, a few recommendations were made on how to improve IM in LRT3 project. This research may address the common concerns of project stakeholders with respect to interface management in railway projects and highlights the importance of having an effective IM framework to avoid project delays and conflicts between the interfacing parties 2024-06-07 Conference or Workshop Item PeerReviewed text en http://eprints.uthm.edu.my/11854/1/J17879_38327a3c2f4905d78c772abd58a6b791.pdf%209.pdf Peniel, Ang Soon Ern and Nordin, Norimran and Saparudin, Faiz Asraf and Tsai, Kai Len and Kasim, Narimah and Osman, Mohamad Hairi (2024) Interface management for telecommunication system during design stage: a case study of LRT3 project. In: AIP Conference Proceedings. https://doi.org/10.1063/5.0199315 |
| spellingShingle | T Technology (General) Peniel, Ang Soon Ern Nordin, Norimran Saparudin, Faiz Asraf Tsai, Kai Len Kasim, Narimah Osman, Mohamad Hairi Interface management for telecommunication system during design stage: a case study of LRT3 project |
| title | Interface management for telecommunication system during design stage: a case study of LRT3 project |
| title_full | Interface management for telecommunication system during design stage: a case study of LRT3 project |
| title_fullStr | Interface management for telecommunication system during design stage: a case study of LRT3 project |
| title_full_unstemmed | Interface management for telecommunication system during design stage: a case study of LRT3 project |
| title_short | Interface management for telecommunication system during design stage: a case study of LRT3 project |
| title_sort | interface management for telecommunication system during design stage: a case study of lrt3 project |
| topic | T Technology (General) |
| url | http://eprints.uthm.edu.my/11854/1/J17879_38327a3c2f4905d78c772abd58a6b791.pdf%209.pdf http://eprints.uthm.edu.my/11854/ https://doi.org/10.1063/5.0199315 |
| url_provider | http://eprints.uthm.edu.my/ |
