Reliability Analysis of a Micro Hydro Power Plants System at Lombok with Expected Energy Not Supplied Method

In the context of this research, understanding the reliability of a power generator is essential as a criterion for assessing its suitability for use or the need for further development. The method used in this study is reliability analysis, known as "Expected Energy Not Supplied (EENS)."...

Full description

Saved in:
Bibliographic Details
Main Authors: Widjonarko, Widjonarko, Saleh, Azmi, Wahyu Mulyo Utomo, Wahyu Mulyo Utomo, Omar, Saodah, Nafi, Muhammad Ilman
Format: Article
Language:en
Published: reric 2024
Subjects:
Online Access:http://eprints.uthm.edu.my/11085/1/J17572_03c3ef07b75fe39acc86329e3c3b5552.pdf
http://eprints.uthm.edu.my/11085/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1833419420662235136
author Widjonarko, Widjonarko
Saleh, Azmi
Wahyu Mulyo Utomo, Wahyu Mulyo Utomo
Omar, Saodah
Nafi, Muhammad Ilman
author_facet Widjonarko, Widjonarko
Saleh, Azmi
Wahyu Mulyo Utomo, Wahyu Mulyo Utomo
Omar, Saodah
Nafi, Muhammad Ilman
author_sort Widjonarko, Widjonarko
building UTHM Library
collection Institutional Repository
content_provider Universiti Tun Hussein Onn Malaysia
content_source UTHM Institutional Repository
continent Asia
country Malaysia
description In the context of this research, understanding the reliability of a power generator is essential as a criterion for assessing its suitability for use or the need for further development. The method used in this study is reliability analysis, known as "Expected Energy Not Supplied (EENS)." The initial step of this method is to calculate the FOR (Forced Outage Rate) to determine the level of disturbances in the generator unit. The subsequent process involves calculating individual probabilities, analyzing the generator load curve, determining the EENS values of three generators, and comparing them with the EENS standards established by the National Electricity Market. These standards stipulate that EENS should not exceed 0.002% of the total energy consumption in the region. This research marks a significant milestone as the first endeavour conducted on Lombok Island within this specific context. The study was conducted by analyzing three operational Micro-Hydro Power (MHP) units on Lombok Island. The research findings indicate that the EENS metric for MHP on Lombok Island stands at 2.822%. This result suggests that the reliability of MHP on Lombok Island falls below the established criterion, which is less than 0.002% annually. In practical terms, these findings imply that MHP plants located on Lombok Island may not be relied upon as the primary source to meet the electricity demands of the Lombok region in 2022. This research provides valuable insights into the challenges of energy reliability on Lombok Island and serves as a crucial foundation for further considerations in the development of renewable energy sources in the region.
format Article
id my.uthm.eprints-11085
institution Universiti Tun Hussein Onn Malaysia
language en
publishDate 2024
publisher reric
record_format eprints
spelling my.uthm.eprints-110852024-06-04T03:05:11Z http://eprints.uthm.edu.my/11085/ Reliability Analysis of a Micro Hydro Power Plants System at Lombok with Expected Energy Not Supplied Method Widjonarko, Widjonarko Saleh, Azmi Wahyu Mulyo Utomo, Wahyu Mulyo Utomo Omar, Saodah Nafi, Muhammad Ilman T Technology (General) In the context of this research, understanding the reliability of a power generator is essential as a criterion for assessing its suitability for use or the need for further development. The method used in this study is reliability analysis, known as "Expected Energy Not Supplied (EENS)." The initial step of this method is to calculate the FOR (Forced Outage Rate) to determine the level of disturbances in the generator unit. The subsequent process involves calculating individual probabilities, analyzing the generator load curve, determining the EENS values of three generators, and comparing them with the EENS standards established by the National Electricity Market. These standards stipulate that EENS should not exceed 0.002% of the total energy consumption in the region. This research marks a significant milestone as the first endeavour conducted on Lombok Island within this specific context. The study was conducted by analyzing three operational Micro-Hydro Power (MHP) units on Lombok Island. The research findings indicate that the EENS metric for MHP on Lombok Island stands at 2.822%. This result suggests that the reliability of MHP on Lombok Island falls below the established criterion, which is less than 0.002% annually. In practical terms, these findings imply that MHP plants located on Lombok Island may not be relied upon as the primary source to meet the electricity demands of the Lombok region in 2022. This research provides valuable insights into the challenges of energy reliability on Lombok Island and serves as a crucial foundation for further considerations in the development of renewable energy sources in the region. reric 2024 Article PeerReviewed text en http://eprints.uthm.edu.my/11085/1/J17572_03c3ef07b75fe39acc86329e3c3b5552.pdf Widjonarko, Widjonarko and Saleh, Azmi and Wahyu Mulyo Utomo, Wahyu Mulyo Utomo and Omar, Saodah and Nafi, Muhammad Ilman (2024) Reliability Analysis of a Micro Hydro Power Plants System at Lombok with Expected Energy Not Supplied Method. Widjonarko W., et al / International Energy Journal, 24. pp. 31-42.
spellingShingle T Technology (General)
Widjonarko, Widjonarko
Saleh, Azmi
Wahyu Mulyo Utomo, Wahyu Mulyo Utomo
Omar, Saodah
Nafi, Muhammad Ilman
Reliability Analysis of a Micro Hydro Power Plants System at Lombok with Expected Energy Not Supplied Method
title Reliability Analysis of a Micro Hydro Power Plants System at Lombok with Expected Energy Not Supplied Method
title_full Reliability Analysis of a Micro Hydro Power Plants System at Lombok with Expected Energy Not Supplied Method
title_fullStr Reliability Analysis of a Micro Hydro Power Plants System at Lombok with Expected Energy Not Supplied Method
title_full_unstemmed Reliability Analysis of a Micro Hydro Power Plants System at Lombok with Expected Energy Not Supplied Method
title_short Reliability Analysis of a Micro Hydro Power Plants System at Lombok with Expected Energy Not Supplied Method
title_sort reliability analysis of a micro hydro power plants system at lombok with expected energy not supplied method
topic T Technology (General)
url http://eprints.uthm.edu.my/11085/1/J17572_03c3ef07b75fe39acc86329e3c3b5552.pdf
http://eprints.uthm.edu.my/11085/
url_provider http://eprints.uthm.edu.my/