Ab Ghani, M. R. (2002). A Fast, Multi-Period Economic Load Dispatch for Large-Scale Power Systems.
Chicago Style (17th ed.) CitationAb Ghani, Mohd Ruddin. A Fast, Multi-Period Economic Load Dispatch for Large-Scale Power Systems. 2002.
MLA (9th ed.) CitationAb Ghani, Mohd Ruddin. A Fast, Multi-Period Economic Load Dispatch for Large-Scale Power Systems. 2002.
Warning: These citations may not always be 100% accurate.
