Hybrid PV and battery system sizing for commercial buildings in Malaysia: A case study of FKE-2 building in UTeM
This paper presents a technique for determining the optimal sizing of a hybrid solar photovoltaic (PV) and battery energy storage (BES) system for grid-connected commercial buildings. The objective is to minimize the total net present cost (NPC), which includes the costs of the PV-BES system and e...
Saved in:
| Main Authors: | , , , , |
|---|---|
| Format: | Article |
| Language: | en |
| Published: |
Institute Of Electrical And Electronics Engineers Inc.
2024
|
| Online Access: | http://eprints.utem.edu.my/id/eprint/28366/2/00334171220241734331412.pdf http://eprints.utem.edu.my/id/eprint/28366/ https://ieeexplore.ieee.org/document/10399799 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1832718900461043712 |
|---|---|
| author | Hossain, Jahangir Shareef, Hussain Hossain, Md. Alamgir Kalam, Akhtar Abdul Kadir, Aida Fazliana |
| author_facet | Hossain, Jahangir Shareef, Hussain Hossain, Md. Alamgir Kalam, Akhtar Abdul Kadir, Aida Fazliana |
| author_sort | Hossain, Jahangir |
| building | UTEM Library |
| collection | Institutional Repository |
| content_provider | Universiti Teknikal Malaysia Melaka |
| content_source | UTEM Institutional Repository |
| continent | Asia |
| country | Malaysia |
| description | This paper presents a technique for determining the
optimal sizing of a hybrid solar photovoltaic (PV) and battery
energy storage (BES) system for grid-connected commercial buildings. The objective is to minimize the total net present cost (NPC), which includes the costs of the PV-BES system and electricity expenses. To achieve this, a rule-based energy management system with peak-shaving is implemented using the particle swarm optimization algorithm. The optimization process takes into account actual annual data on solar insolation, air temperature, load consumption, electricity net energy metering (NEM) prices, and the limitation of PV power exporting to the grid. The proposed technique is applied to the configuration of PV-BES systems in Malaysian commercial buildings. The optimization results are validated through uncertainty analysis using ten years of real data.
A realistic cash flow analysis is presented, showing the customer’s annual payments throughout the project’s lifetime. The study focuses on a case study of a grid-connected commercial building (Fakulti Kejuruteraan Elektrik - FKE-2) at Universiti Teknikal Malaysia (UTeM) in Melaka. The results demonstrate reductions of 12.33% in the cost of electricity (COE), 22.62% in annual energy consumption, and 15.85% in peak demand. Furthermore, the proposed optimization technique is implemented and discussed in other states of Malaysia for comparison purposes. |
| format | Article |
| id | my.utem.eprints-28366 |
| institution | Universiti Teknikal Malaysia Melaka |
| language | en |
| publishDate | 2024 |
| publisher | Institute Of Electrical And Electronics Engineers Inc. |
| record_format | eprints |
| spelling | my.utem.eprints-283662025-02-05T15:36:30Z http://eprints.utem.edu.my/id/eprint/28366/ Hybrid PV and battery system sizing for commercial buildings in Malaysia: A case study of FKE-2 building in UTeM Hossain, Jahangir Shareef, Hussain Hossain, Md. Alamgir Kalam, Akhtar Abdul Kadir, Aida Fazliana This paper presents a technique for determining the optimal sizing of a hybrid solar photovoltaic (PV) and battery energy storage (BES) system for grid-connected commercial buildings. The objective is to minimize the total net present cost (NPC), which includes the costs of the PV-BES system and electricity expenses. To achieve this, a rule-based energy management system with peak-shaving is implemented using the particle swarm optimization algorithm. The optimization process takes into account actual annual data on solar insolation, air temperature, load consumption, electricity net energy metering (NEM) prices, and the limitation of PV power exporting to the grid. The proposed technique is applied to the configuration of PV-BES systems in Malaysian commercial buildings. The optimization results are validated through uncertainty analysis using ten years of real data. A realistic cash flow analysis is presented, showing the customer’s annual payments throughout the project’s lifetime. The study focuses on a case study of a grid-connected commercial building (Fakulti Kejuruteraan Elektrik - FKE-2) at Universiti Teknikal Malaysia (UTeM) in Melaka. The results demonstrate reductions of 12.33% in the cost of electricity (COE), 22.62% in annual energy consumption, and 15.85% in peak demand. Furthermore, the proposed optimization technique is implemented and discussed in other states of Malaysia for comparison purposes. Institute Of Electrical And Electronics Engineers Inc. 2024-05 Article PeerReviewed text en cc_by_nc_nd http://eprints.utem.edu.my/id/eprint/28366/2/00334171220241734331412.pdf Hossain, Jahangir and Shareef, Hussain and Hossain, Md. Alamgir and Kalam, Akhtar and Abdul Kadir, Aida Fazliana (2024) Hybrid PV and battery system sizing for commercial buildings in Malaysia: A case study of FKE-2 building in UTeM. IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 60 (3). pp. 4933-4945. ISSN 0093-9994 https://ieeexplore.ieee.org/document/10399799 10.1109/TIA.2024.3353714 |
| spellingShingle | Hossain, Jahangir Shareef, Hussain Hossain, Md. Alamgir Kalam, Akhtar Abdul Kadir, Aida Fazliana Hybrid PV and battery system sizing for commercial buildings in Malaysia: A case study of FKE-2 building in UTeM |
| title | Hybrid PV and battery system sizing for commercial buildings in Malaysia: A case study of FKE-2 building in UTeM |
| title_full | Hybrid PV and battery system sizing for commercial buildings in Malaysia: A case study of FKE-2 building in UTeM |
| title_fullStr | Hybrid PV and battery system sizing for commercial buildings in Malaysia: A case study of FKE-2 building in UTeM |
| title_full_unstemmed | Hybrid PV and battery system sizing for commercial buildings in Malaysia: A case study of FKE-2 building in UTeM |
| title_short | Hybrid PV and battery system sizing for commercial buildings in Malaysia: A case study of FKE-2 building in UTeM |
| title_sort | hybrid pv and battery system sizing for commercial buildings in malaysia: a case study of fke-2 building in utem |
| url | http://eprints.utem.edu.my/id/eprint/28366/2/00334171220241734331412.pdf http://eprints.utem.edu.my/id/eprint/28366/ https://ieeexplore.ieee.org/document/10399799 |
| url_provider | http://eprints.utem.edu.my/ |
