Multipronged Projects To Improve Flow And Responsiveness In Receiving

Receiving of a manufacturing facility involves handling of a high variety of items loaded from different suppliers. The process can be complicated as documents have to be processed, quality inspection and test, relabelling, good transportation, warehouse admission and storage, return goods and clear...

Full description

Saved in:
Bibliographic Details
Main Author: Koh, Han Teng
Format: Monograph
Language:en
Published: Universiti Sains Malaysia 2017
Subjects:
Online Access:http://eprints.usm.my/53728/1/Multipronged%20Projects%20To%20Improve%20Flow%20And%20Responsiveness%20In%20Receiving_Koh%20Han%20Teng_M4_2017.pdf
http://eprints.usm.my/53728/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1834505534630264832
author Koh, Han Teng
author_facet Koh, Han Teng
author_sort Koh, Han Teng
building Hamzah Sendut Library
collection Institutional Repository
content_provider Universiti Sains Malaysia
content_source USM Institutional Repository
continent Asia
country Malaysia
description Receiving of a manufacturing facility involves handling of a high variety of items loaded from different suppliers. The process can be complicated as documents have to be processed, quality inspection and test, relabelling, good transportation, warehouse admission and storage, return goods and clearance all happen concurrently. In the absence of proper coordination, receiving can be chaotic and congested, especially during the peak seasons in which inundation of incoming goods from suppliers is common. Another concern lays on the process efficiency in terms of flow and responsiveness, as any delay inevitably expand manufacturing lead time. Based on the strict sense of lean manufacturing, receiving is considered non-value added but necessary process. Empirical studies on industry improvements at receiving are scarce in literature. This research investigated ways to improve receiving process, following the Plan-do-check-act (PDCA) methodology. The improvement led to multipronged endeavours mainly to improve the interdepartmental responsiveness. This research led to the improved flow of materials in BSM’s warehouse, reducing the time for newly received raw materials to be allocated in their final locations in warehouse. This enables sufficient raw materials to be sent into production lines and ensure smoother productions. This research provided the practitioner to have a clearer view towards to flow of materials in the warehouse, as well as determining the possible wastes in the flow of raw materials from receiving process to put away processes (final location).
format Monograph
id my.usm.eprints.53728
institution Universiti Sains Malaysia
language en
publishDate 2017
publisher Universiti Sains Malaysia
record_format eprints
spelling my.usm.eprints.53728 http://eprints.usm.my/53728/ Multipronged Projects To Improve Flow And Responsiveness In Receiving Koh, Han Teng T Technology TJ Mechanical engineering and machinery Receiving of a manufacturing facility involves handling of a high variety of items loaded from different suppliers. The process can be complicated as documents have to be processed, quality inspection and test, relabelling, good transportation, warehouse admission and storage, return goods and clearance all happen concurrently. In the absence of proper coordination, receiving can be chaotic and congested, especially during the peak seasons in which inundation of incoming goods from suppliers is common. Another concern lays on the process efficiency in terms of flow and responsiveness, as any delay inevitably expand manufacturing lead time. Based on the strict sense of lean manufacturing, receiving is considered non-value added but necessary process. Empirical studies on industry improvements at receiving are scarce in literature. This research investigated ways to improve receiving process, following the Plan-do-check-act (PDCA) methodology. The improvement led to multipronged endeavours mainly to improve the interdepartmental responsiveness. This research led to the improved flow of materials in BSM’s warehouse, reducing the time for newly received raw materials to be allocated in their final locations in warehouse. This enables sufficient raw materials to be sent into production lines and ensure smoother productions. This research provided the practitioner to have a clearer view towards to flow of materials in the warehouse, as well as determining the possible wastes in the flow of raw materials from receiving process to put away processes (final location). Universiti Sains Malaysia 2017-06-01 Monograph NonPeerReviewed application/pdf en http://eprints.usm.my/53728/1/Multipronged%20Projects%20To%20Improve%20Flow%20And%20Responsiveness%20In%20Receiving_Koh%20Han%20Teng_M4_2017.pdf Koh, Han Teng (2017) Multipronged Projects To Improve Flow And Responsiveness In Receiving. Project Report. Universiti Sains Malaysia, Pusat Pengajian Kejuruteraan Mekanik. (Submitted)
spellingShingle T Technology
TJ Mechanical engineering and machinery
Koh, Han Teng
Multipronged Projects To Improve Flow And Responsiveness In Receiving
title Multipronged Projects To Improve Flow And Responsiveness In Receiving
title_full Multipronged Projects To Improve Flow And Responsiveness In Receiving
title_fullStr Multipronged Projects To Improve Flow And Responsiveness In Receiving
title_full_unstemmed Multipronged Projects To Improve Flow And Responsiveness In Receiving
title_short Multipronged Projects To Improve Flow And Responsiveness In Receiving
title_sort multipronged projects to improve flow and responsiveness in receiving
topic T Technology
TJ Mechanical engineering and machinery
url http://eprints.usm.my/53728/1/Multipronged%20Projects%20To%20Improve%20Flow%20And%20Responsiveness%20In%20Receiving_Koh%20Han%20Teng_M4_2017.pdf
http://eprints.usm.my/53728/
url_provider http://eprints.usm.my/