Transfer Functions In Hierarchical Production Planning.
In the production planning it is essential to determine simultaneously the production program, the lot sizes as well as sequencing and scheduling the batches: the plannning of the production program requires the knowledge of the available manufacturing capacities;these depend, however, on the set-up...
Saved in:
| Main Author: | |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | en |
| Published: |
2005
|
| Subjects: | |
| Online Access: | http://eprints.usm.my/432/1/Transfer_Functions_In_Hierarchical_Production_Planning.pdf http://eprints.usm.my/432/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1832620680027308032 |
|---|---|
| author | Kamil, Anton Abdulbasah |
| author_facet | Kamil, Anton Abdulbasah |
| author_sort | Kamil, Anton Abdulbasah |
| building | Hamzah Sendut Library |
| collection | Institutional Repository |
| content_provider | Universiti Sains Malaysia |
| content_source | USM Institutional Repository |
| continent | Asia |
| country | Malaysia |
| description | In the production planning it is essential to determine simultaneously the production program, the lot sizes as well as sequencing and scheduling the batches: the plannning of the production program requires the knowledge of the available manufacturing capacities;these depend, however, on the set-up times determined by lot-sizing, and the idle times of machines induced by sequencing and scheduling. |
| format | Conference or Workshop Item |
| id | my.usm.eprints.432 |
| institution | Universiti Sains Malaysia |
| language | en |
| publishDate | 2005 |
| record_format | eprints |
| spelling | my.usm.eprints.432 http://eprints.usm.my/432/ Transfer Functions In Hierarchical Production Planning. Kamil, Anton Abdulbasah QA Mathematics In the production planning it is essential to determine simultaneously the production program, the lot sizes as well as sequencing and scheduling the batches: the plannning of the production program requires the knowledge of the available manufacturing capacities;these depend, however, on the set-up times determined by lot-sizing, and the idle times of machines induced by sequencing and scheduling. 2005-05 Conference or Workshop Item PeerReviewed application/pdf en http://eprints.usm.my/432/1/Transfer_Functions_In_Hierarchical_Production_Planning.pdf Kamil, Anton Abdulbasah (2005) Transfer Functions In Hierarchical Production Planning. In: Proceedings Of The 2nd International Conference On Research And Education In Mathematics (ICREM 2), 25-26 Mei 2005, Selangor,Malaysia. (Submitted) |
| spellingShingle | QA Mathematics Kamil, Anton Abdulbasah Transfer Functions In Hierarchical Production Planning. |
| title | Transfer Functions In Hierarchical Production Planning. |
| title_full | Transfer Functions In Hierarchical Production Planning. |
| title_fullStr | Transfer Functions In Hierarchical Production Planning. |
| title_full_unstemmed | Transfer Functions In Hierarchical Production Planning. |
| title_short | Transfer Functions In Hierarchical Production Planning. |
| title_sort | transfer functions in hierarchical production planning. |
| topic | QA Mathematics |
| url | http://eprints.usm.my/432/1/Transfer_Functions_In_Hierarchical_Production_Planning.pdf http://eprints.usm.my/432/ |
| url_provider | http://eprints.usm.my/ |
