Study on factors affecting productivity of light rail transit (LRT) construction project by using regression analysis

TA1205.N87 2016

Saved in:
Bibliographic Details
Main Author: Nur Atiqah Zainal
Format: text::Final Year Project
Language:en
Published: 2024
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1840210134980100096
author Nur Atiqah Zainal
author_facet Nur Atiqah Zainal
author_sort Nur Atiqah Zainal
building UNITEN Library
collection Institutional Repository
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
continent Asia
country Malaysia
description TA1205.N87 2016
format Resource Types::text::Final Year Project
id my.uniten.dspace-32028
institution Universiti Tenaga Nasional
language en
publishDate 2024
record_format dspace
spelling my.uniten.dspace-320282025-08-11T09:58:49Z Study on factors affecting productivity of light rail transit (LRT) construction project by using regression analysis Nur Atiqah Zainal Street Urban transportation Local transit TA1205.N87 2016 This thesis paper present the productivity of the Light Rail Transit (LRT) construction project by using regression analysis around Klang Valley. In urban area, public transport is one of the necessary transportation as to transport from one place to another place. With the undergoing of LRT extension construction project, identify the factor that affect the productivity rate is a way to reduce the time delay of the project. Thus the objective of this study is to identify factor and compare the relationship based on the productivity performance. For this purpose, questionnaire has been distributed to several organization who play major role in construction and with the calculation of Relative Important Index (RII), four top factor has been determined. A regression analysis has been done to classify the significant or insignificant of the factor and also the relationship of the factor respect to the time delay. It is found that, only two factor are significant which are labour and design changes. With all the data required in this study, this thesis paper shows how to predict the productivity performance by modelling equation based on the significant factor. 2024-04-30T01:52:59Z 2024-04-30T01:52:59Z 2016 Resource Types::text::Final Year Project https://irepository.uniten.edu.my/handle/123456789/32028 en application/pdf
spellingShingle Street
Urban transportation
Local transit
Nur Atiqah Zainal
Study on factors affecting productivity of light rail transit (LRT) construction project by using regression analysis
title Study on factors affecting productivity of light rail transit (LRT) construction project by using regression analysis
title_full Study on factors affecting productivity of light rail transit (LRT) construction project by using regression analysis
title_fullStr Study on factors affecting productivity of light rail transit (LRT) construction project by using regression analysis
title_full_unstemmed Study on factors affecting productivity of light rail transit (LRT) construction project by using regression analysis
title_short Study on factors affecting productivity of light rail transit (LRT) construction project by using regression analysis
title_sort study on factors affecting productivity of light rail transit (lrt) construction project by using regression analysis
topic Street
Urban transportation
Local transit
url_provider http://dspace.uniten.edu.my/