Intelligent optimization systems for steam boiler maintenance: real case study

The steam boiler plays an integral role in power plants. Most researcher detected that steam boiler in a power plant face an issue of a major outage. To avoid repetition of outage or failure, preventive maintenance scheduling also known as scheduled maintenance has been used widely in the power plan...

Full description

Saved in:
Bibliographic Details
Main Authors: Fuzi N.F.A., Ismail F.B.
Other Authors: 57211807166
Format: Article
Published: Institute of Advanced Scientific Research, Inc. 2023
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1833412087583342592
author Fuzi N.F.A.
Ismail F.B.
author2 57211807166
author_facet 57211807166
Fuzi N.F.A.
Ismail F.B.
author_sort Fuzi N.F.A.
building UNITEN Library
collection Institutional Repository
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
continent Asia
country Malaysia
description The steam boiler plays an integral role in power plants. Most researcher detected that steam boiler in a power plant face an issue of a major outage. To avoid repetition of outage or failure, preventive maintenance scheduling also known as scheduled maintenance has been used widely in the power plant as an alternative based on the failure history of the equipment. However, the main issue plaguing scheduled maintenance is the redundancy of maintenance activities. Based on the selected adopted case study, we identified certain redundant activities in the scheduling. As a potential solution to this problem, the Analytic Hierarchy Process (AHP) and the Particle Swarm Optimization (PSO) are implemented to the adopted case study to optimize the maintenance operational duration and cost before implementing to the real case study. � 2019, Institute of Advanced Scientific Research, Inc.. All rights reserved.
format Article
id my.uniten.dspace-24860
institution Universiti Tenaga Nasional
publishDate 2023
publisher Institute of Advanced Scientific Research, Inc.
record_format dspace
spelling my.uniten.dspace-248602023-05-29T15:27:59Z Intelligent optimization systems for steam boiler maintenance: real case study Fuzi N.F.A. Ismail F.B. 57211807166 58027086700 The steam boiler plays an integral role in power plants. Most researcher detected that steam boiler in a power plant face an issue of a major outage. To avoid repetition of outage or failure, preventive maintenance scheduling also known as scheduled maintenance has been used widely in the power plant as an alternative based on the failure history of the equipment. However, the main issue plaguing scheduled maintenance is the redundancy of maintenance activities. Based on the selected adopted case study, we identified certain redundant activities in the scheduling. As a potential solution to this problem, the Analytic Hierarchy Process (AHP) and the Particle Swarm Optimization (PSO) are implemented to the adopted case study to optimize the maintenance operational duration and cost before implementing to the real case study. � 2019, Institute of Advanced Scientific Research, Inc.. All rights reserved. Final 2023-05-29T07:27:59Z 2023-05-29T07:27:59Z 2019 Article 2-s2.0-85079036479 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85079036479&partnerID=40&md5=b352187ea41ab01b7ec7ed71311e0099 https://irepository.uniten.edu.my/handle/123456789/24860 11 3 Special Issue 1749 1755 Institute of Advanced Scientific Research, Inc. Scopus
spellingShingle Fuzi N.F.A.
Ismail F.B.
Intelligent optimization systems for steam boiler maintenance: real case study
title Intelligent optimization systems for steam boiler maintenance: real case study
title_full Intelligent optimization systems for steam boiler maintenance: real case study
title_fullStr Intelligent optimization systems for steam boiler maintenance: real case study
title_full_unstemmed Intelligent optimization systems for steam boiler maintenance: real case study
title_short Intelligent optimization systems for steam boiler maintenance: real case study
title_sort intelligent optimization systems for steam boiler maintenance: real case study
url_provider http://dspace.uniten.edu.my/