Assessing Predicting Factors: Good Management Practices Towards the Successful Implementation of Green Supply Chain Management (GSCM) in IBS Construction Project
The increasing push to use Industrialised Building System (IBS) in the current Malaysian construction industry has opened up opportunities for the implementation of Green Supply Chain Management (GSCM) in IBS to optimise the advantage of environmental sustainability and the green concept. This resea...
Saved in:
| Main Authors: | , , , , |
|---|---|
| Format: | Article |
| Language: | en |
| Published: |
CIDB Malaysia
2021
|
| Subjects: | |
| Online Access: | http://ir.unimas.my/id/eprint/36088/1/chain1.pdf http://ir.unimas.my/id/eprint/36088/ https://www.cream.my/my/publication/download-malaysian-construction-research-journal/mcrj-volume-33-no-1-2021 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Summary: | The increasing push to use Industrialised Building System (IBS) in the current Malaysian construction industry has opened up opportunities for the implementation of Green Supply Chain Management (GSCM) in IBS to optimise the advantage of environmental sustainability and the green concept. This research aims to investigate the relationship of good management practices towards the successful implementation of GSCM in IBS construction project by adopting a quantitative method through a questionnaire survey and qualitative
method to verify the responses. A total of 30 valid responses were analysed by using
Regression method. The response obtained is within the IBS key players and evaluated
using regression analysis. The results are validated by three (3) IBS industry experts to
identify the relationship between good management practices towards successful GSCM
implementation in IBS construction. Preliminary findings from the analysis found that all the
management practices are significant to the successful implementation of GSCM in IBS
construction. Successful implementation will lead to the investigation on how the performance
of GSCM can help to digitalize the supply chain management towards the Fourth Industrial
Revolution (IR 4.0) in IBS construction. |
|---|
