A case study of S-Curve analysis: Causes, effects, tracing and monitoring project extension of time
S-Curve analysis in the construction interpreted as managing project with knowledge and traceable in the context of sustainable construction while displays the cumulative costs, labour hours or other quantities plotted against time. In the contract administration, delays in completing a construction...
Saved in:
| Main Authors: | , , , , , |
|---|---|
| Format: | Article |
| Language: | en en |
| Published: |
Salehan Institute of Higher Education
2021
|
| Subjects: | |
| Online Access: | https://eprints.ums.edu.my/id/eprint/30607/2/A%20case%20study%20of%20S-Curve%20analysis%2C%20Causes%2C%20effects%2C%20tracing%20and%20monitoring%20project%20extension%20of%20time-Abstract.pdf https://eprints.ums.edu.my/id/eprint/30607/1/A%20case%20study%20of%20S-Curve%20analysis%2C%20Causes%2C%20effects%2C%20tracing%20and%20monitoring%20project%20extension%20of%20time.pdf https://eprints.ums.edu.my/id/eprint/30607/ https://www.scopus.com/inward/record.uri?eid=2-s2.0-85108438142&doi=10.28991%2fcej-2021-03091679&partnerID=40&md5=48ab901d308b302150184acec8b856cd http://dx.doi.org/10.28991/cej-2021-03091679 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1831794423231414272 |
|---|---|
| author | Habib Musa Mohamad Mohamad Ibrahim Mohamad Ismail Saad Nurmin Bolong J. Mustazama Siti Nooraiin Mohd Razali |
| author_facet | Habib Musa Mohamad Mohamad Ibrahim Mohamad Ismail Saad Nurmin Bolong J. Mustazama Siti Nooraiin Mohd Razali |
| author_sort | Habib Musa Mohamad |
| building | UMS Library |
| collection | Institutional Repository |
| content_provider | Universiti Malaysia Sabah |
| content_source | UMS Institutional Repository |
| continent | Asia |
| country | Malaysia |
| description | S-Curve analysis in the construction interpreted as managing project with knowledge and traceable in the context of sustainable construction while displays the cumulative costs, labour hours or other quantities plotted against time. In the contract administration, delays in completing a construction project led to the breach of contract but, in contracts itself allow the construction period to be extended where there are delays that are not the contractor's fault. Under those circumstances, a presentation of a case-study regarding the analysis of S-Curve of a life project drew comparative interpretation of project performance towards project delivery schedule has been conducted in private initiative project. This study aims to investigate and examine the factors that cause delays in construction projects from the perspective of S-curve representations. The paper aims to provide in depth light about the existing causes of project delay and describe the key sources of financing problem and identify the consequences of contraventions of contract. Two distinct parts divided which are refers to the methods used to assess the perceptions of clients, consultants, and contractors on the relative importance of causes of delay in a project and referred to the procurement and documentation to analyse the delay. As a result, an Extension of Time (EOT) granted and identically changed the progress towards extension time where better planning demanded for improvement and restoration progress kept on track. This paper presented a practical and comparative S-Curve within extension of time to ensure delivery of project on schedule. In the long run, the identified causes are combined into 16 factors. Finally, the result of this match was brought in order to critically understand and provide a guideline to contractor in preparing EOT application and choose reliable factor based on the specific circumstances of project delay factors thorough review conducted to reveal the nature of EOT application techniques. |
| format | Article |
| id | my.ums.eprints-30607 |
| institution | Universiti Malaysia Sabah |
| language | en en |
| publishDate | 2021 |
| publisher | Salehan Institute of Higher Education |
| record_format | eprints |
| spelling | my.ums.eprints-306072021-10-25T11:06:55Z https://eprints.ums.edu.my/id/eprint/30607/ A case study of S-Curve analysis: Causes, effects, tracing and monitoring project extension of time Habib Musa Mohamad Mohamad Ibrahim Mohamad Ismail Saad Nurmin Bolong J. Mustazama Siti Nooraiin Mohd Razali HD28-70 Management. Industrial management QA299.6-433 Analysis S-Curve analysis in the construction interpreted as managing project with knowledge and traceable in the context of sustainable construction while displays the cumulative costs, labour hours or other quantities plotted against time. In the contract administration, delays in completing a construction project led to the breach of contract but, in contracts itself allow the construction period to be extended where there are delays that are not the contractor's fault. Under those circumstances, a presentation of a case-study regarding the analysis of S-Curve of a life project drew comparative interpretation of project performance towards project delivery schedule has been conducted in private initiative project. This study aims to investigate and examine the factors that cause delays in construction projects from the perspective of S-curve representations. The paper aims to provide in depth light about the existing causes of project delay and describe the key sources of financing problem and identify the consequences of contraventions of contract. Two distinct parts divided which are refers to the methods used to assess the perceptions of clients, consultants, and contractors on the relative importance of causes of delay in a project and referred to the procurement and documentation to analyse the delay. As a result, an Extension of Time (EOT) granted and identically changed the progress towards extension time where better planning demanded for improvement and restoration progress kept on track. This paper presented a practical and comparative S-Curve within extension of time to ensure delivery of project on schedule. In the long run, the identified causes are combined into 16 factors. Finally, the result of this match was brought in order to critically understand and provide a guideline to contractor in preparing EOT application and choose reliable factor based on the specific circumstances of project delay factors thorough review conducted to reveal the nature of EOT application techniques. Salehan Institute of Higher Education 2021-04-01 Article PeerReviewed text en https://eprints.ums.edu.my/id/eprint/30607/2/A%20case%20study%20of%20S-Curve%20analysis%2C%20Causes%2C%20effects%2C%20tracing%20and%20monitoring%20project%20extension%20of%20time-Abstract.pdf text en https://eprints.ums.edu.my/id/eprint/30607/1/A%20case%20study%20of%20S-Curve%20analysis%2C%20Causes%2C%20effects%2C%20tracing%20and%20monitoring%20project%20extension%20of%20time.pdf Habib Musa Mohamad and Mohamad Ibrahim Mohamad and Ismail Saad and Nurmin Bolong and J. Mustazama and Siti Nooraiin Mohd Razali (2021) A case study of S-Curve analysis: Causes, effects, tracing and monitoring project extension of time. Civil Engineering Journal, 7 (4). pp. 649-661. ISSN 2676-6957 (P-ISSN) , 2476-3055 (E-ISSN) https://www.scopus.com/inward/record.uri?eid=2-s2.0-85108438142&doi=10.28991%2fcej-2021-03091679&partnerID=40&md5=48ab901d308b302150184acec8b856cd http://dx.doi.org/10.28991/cej-2021-03091679 http://dx.doi.org/10.28991/cej-2021-03091679 |
| spellingShingle | HD28-70 Management. Industrial management QA299.6-433 Analysis Habib Musa Mohamad Mohamad Ibrahim Mohamad Ismail Saad Nurmin Bolong J. Mustazama Siti Nooraiin Mohd Razali A case study of S-Curve analysis: Causes, effects, tracing and monitoring project extension of time |
| title | A case study of S-Curve analysis: Causes, effects, tracing and monitoring project extension of time |
| title_full | A case study of S-Curve analysis: Causes, effects, tracing and monitoring project extension of time |
| title_fullStr | A case study of S-Curve analysis: Causes, effects, tracing and monitoring project extension of time |
| title_full_unstemmed | A case study of S-Curve analysis: Causes, effects, tracing and monitoring project extension of time |
| title_short | A case study of S-Curve analysis: Causes, effects, tracing and monitoring project extension of time |
| title_sort | case study of s-curve analysis: causes, effects, tracing and monitoring project extension of time |
| topic | HD28-70 Management. Industrial management QA299.6-433 Analysis |
| url | https://eprints.ums.edu.my/id/eprint/30607/2/A%20case%20study%20of%20S-Curve%20analysis%2C%20Causes%2C%20effects%2C%20tracing%20and%20monitoring%20project%20extension%20of%20time-Abstract.pdf https://eprints.ums.edu.my/id/eprint/30607/1/A%20case%20study%20of%20S-Curve%20analysis%2C%20Causes%2C%20effects%2C%20tracing%20and%20monitoring%20project%20extension%20of%20time.pdf https://eprints.ums.edu.my/id/eprint/30607/ https://www.scopus.com/inward/record.uri?eid=2-s2.0-85108438142&doi=10.28991%2fcej-2021-03091679&partnerID=40&md5=48ab901d308b302150184acec8b856cd http://dx.doi.org/10.28991/cej-2021-03091679 http://dx.doi.org/10.28991/cej-2021-03091679 |
| url_provider | http://eprints.ums.edu.my/ |
