Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System

Technological developments in industrial innovations have currently been related to interconnected system assistance and distribution networks. This important in order to enable an electrical load to continue receive power in the event of disconnection of load from the main power grid. This pape...

Full description

Saved in:
Bibliographic Details
Main Authors: Abu Zaharin, Ahmad, Shalash, Nadheer A.
Format: Article
Language:en
Published: World Academy of Science, Engineering and Technology 2014
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/5807/1/Reliability-Assessment-for-Tie-Line-Capacity-Assistance-of-Power-Systems-Based-On-Multi-Agent-System.pdf
http://umpir.ump.edu.my/id/eprint/5807/
http://waset.org/Publication/reliability-assessment-for-tie-line-capacity-assistance-of-power-systems-based-on-multi-agent-system/9997398
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1831521832429158400
author Abu Zaharin, Ahmad
Shalash, Nadheer A.
author_facet Abu Zaharin, Ahmad
Shalash, Nadheer A.
author_sort Abu Zaharin, Ahmad
building UMPSA Library
collection Institutional Repository
content_provider Universiti Malaysia Pahang Al-Sultan Abdullah
content_source UMPSA Institutional Repository
continent Asia
country Malaysia
description Technological developments in industrial innovations have currently been related to interconnected system assistance and distribution networks. This important in order to enable an electrical load to continue receive power in the event of disconnection of load from the main power grid. This paper represents a method for reliability assessment of interconnected power systems based. The multi-agent system consists of four agents. The first agent was the generator agent to using as connected the generator to the grid depending on the state of the reserve margin and the load demand. The second was a load agent is that located at the load. Meanwhile, the third is so-called "the reverse margin agent" that to limit the reserve margin between 0 - 25% depend on the load and the unit size generator. In the end, calculation reliability Agent can be calculate expected energy not supplied (EENS), loss of load expectation (LOLE) and the effecting of tie line capacity to determine the risk levels Roy Billinton Test System (RBTS) can use to evaluated the reliability indices by using the developed JADE package. The results estimated of the reliability interconnection power systems presented in this paper. The overall reliability of power system can be improved. Thus, the market becomes more concentrated against demand increasing and the generation units were operating in relation to reliability indices.
format Article
id my.ump.umpir.5807
institution Universiti Malaysia Pahang
language en
publishDate 2014
publisher World Academy of Science, Engineering and Technology
record_format eprints
spelling my.ump.umpir.58072018-02-02T01:57:34Z http://umpir.ump.edu.my/id/eprint/5807/ Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System Abu Zaharin, Ahmad Shalash, Nadheer A. TK Electrical engineering. Electronics Nuclear engineering Technological developments in industrial innovations have currently been related to interconnected system assistance and distribution networks. This important in order to enable an electrical load to continue receive power in the event of disconnection of load from the main power grid. This paper represents a method for reliability assessment of interconnected power systems based. The multi-agent system consists of four agents. The first agent was the generator agent to using as connected the generator to the grid depending on the state of the reserve margin and the load demand. The second was a load agent is that located at the load. Meanwhile, the third is so-called "the reverse margin agent" that to limit the reserve margin between 0 - 25% depend on the load and the unit size generator. In the end, calculation reliability Agent can be calculate expected energy not supplied (EENS), loss of load expectation (LOLE) and the effecting of tie line capacity to determine the risk levels Roy Billinton Test System (RBTS) can use to evaluated the reliability indices by using the developed JADE package. The results estimated of the reliability interconnection power systems presented in this paper. The overall reliability of power system can be improved. Thus, the market becomes more concentrated against demand increasing and the generation units were operating in relation to reliability indices. World Academy of Science, Engineering and Technology 2014 Article PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/5807/1/Reliability-Assessment-for-Tie-Line-Capacity-Assistance-of-Power-Systems-Based-On-Multi-Agent-System.pdf Abu Zaharin, Ahmad and Shalash, Nadheer A. (2014) Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System. International Journal of Electrical, Electronic Science and Engineering, 8 (2). pp. 236-243. ISSN 9997398. (Published) http://waset.org/Publication/reliability-assessment-for-tie-line-capacity-assistance-of-power-systems-based-on-multi-agent-system/9997398
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Abu Zaharin, Ahmad
Shalash, Nadheer A.
Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System
title Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System
title_full Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System
title_fullStr Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System
title_full_unstemmed Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System
title_short Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System
title_sort reliability assessment for tie line capacity assistance of power systems based on multi-agent system
topic TK Electrical engineering. Electronics Nuclear engineering
url http://umpir.ump.edu.my/id/eprint/5807/1/Reliability-Assessment-for-Tie-Line-Capacity-Assistance-of-Power-Systems-Based-On-Multi-Agent-System.pdf
http://umpir.ump.edu.my/id/eprint/5807/
http://waset.org/Publication/reliability-assessment-for-tie-line-capacity-assistance-of-power-systems-based-on-multi-agent-system/9997398
url_provider http://umpir.ump.edu.my/