Guide signs for approach roads to UMP

This study intended to examine guide sign to UMP by inventory survey and questionnaire survey method. Throughout the whole site inventory survey, it was found that there was numerous of signage leading to UMP that were not following the standard of Arahan Teknik Jalan of JKR. This project intended t...

Full description

Saved in:
Bibliographic Details
Main Author: Tan, Boon Kei
Format: Undergraduates Project Papers
Language:en
Published: 2010
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/2555/1/TAN_BOON_KEI.PDF
http://umpir.ump.edu.my/id/eprint/2555/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1831521236335722496
author Tan, Boon Kei
author_facet Tan, Boon Kei
author_sort Tan, Boon Kei
building UMPSA Library
collection Institutional Repository
content_provider Universiti Malaysia Pahang Al-Sultan Abdullah
content_source UMPSA Institutional Repository
continent Asia
country Malaysia
description This study intended to examine guide sign to UMP by inventory survey and questionnaire survey method. Throughout the whole site inventory survey, it was found that there was numerous of signage leading to UMP that were not following the standard of Arahan Teknik Jalan of JKR. This project intended to check JKR requirements whiôh include the distance from edge junction, visibility, availability, height of the guide sign and so on. Mostly criteria can be achieved by visibility survey. Questionnaire survey was also conducted as to gain drivers perception particularly new corners, to UMP. With all required data in hands, proper recommendation were made as guide for authorities like JKR when upgrading signage for approach roads to UMP in Gambang.
format Undergraduates Project Papers
id my.ump.umpir.2555
institution Universiti Malaysia Pahang
language en
publishDate 2010
record_format eprints
spelling my.ump.umpir.25552021-06-25T03:47:12Z http://umpir.ump.edu.my/id/eprint/2555/ Guide signs for approach roads to UMP Tan, Boon Kei TE Highway engineering. Roads and pavements This study intended to examine guide sign to UMP by inventory survey and questionnaire survey method. Throughout the whole site inventory survey, it was found that there was numerous of signage leading to UMP that were not following the standard of Arahan Teknik Jalan of JKR. This project intended to check JKR requirements whiôh include the distance from edge junction, visibility, availability, height of the guide sign and so on. Mostly criteria can be achieved by visibility survey. Questionnaire survey was also conducted as to gain drivers perception particularly new corners, to UMP. With all required data in hands, proper recommendation were made as guide for authorities like JKR when upgrading signage for approach roads to UMP in Gambang. 2010-11 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/2555/1/TAN_BOON_KEI.PDF Tan, Boon Kei (2010) Guide signs for approach roads to UMP. Faculty of Civil and Environmental Engineering, Universiti Malaysia Pahang .
spellingShingle TE Highway engineering. Roads and pavements
Tan, Boon Kei
Guide signs for approach roads to UMP
title Guide signs for approach roads to UMP
title_full Guide signs for approach roads to UMP
title_fullStr Guide signs for approach roads to UMP
title_full_unstemmed Guide signs for approach roads to UMP
title_short Guide signs for approach roads to UMP
title_sort guide signs for approach roads to ump
topic TE Highway engineering. Roads and pavements
url http://umpir.ump.edu.my/id/eprint/2555/1/TAN_BOON_KEI.PDF
http://umpir.ump.edu.my/id/eprint/2555/
url_provider http://umpir.ump.edu.my/