Series division method based on PSO and FA to optimize Long-Term Hydro Generation Scheduling

The fundamental requirement of power system hydro scheduling is to determine the optimal amount of generated powers for the hydro unit of the system in the scheduling horizon of 1 year or few years while satisfying the constraints of the hydroelectric system. Long-Term Hydro Generation Scheduling...

Full description

Saved in:
Bibliographic Details
Main Authors: Hammid, Ali Thaeer, M. H., Sulaiman
Format: Article
Language:en
Published: Elsevier 2018
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/23313/1/Series%20division%20method%20based%20on%20PSO%20and%20FA%20to%20optimize.pdf
http://umpir.ump.edu.my/id/eprint/23313/
https://doi.org/10.1016/j.seta.2018.06.001
Tags: Add Tag
No Tags, Be the first to tag this record!