Deep continual learning for predicting blast-induced overbreak in tunnel construction / He Biao
Tunnel construction, a critical component of modern infrastructure development, faces the persistent challenge of blast-induced overbreak. Overbreak, the excessive removal of rock mass beyond the planned tunnel profile, poses significant safety risks, increases costs, and causes project delays. T...
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis |
| Published: |
2024
|
| Subjects: | |
| Online Access: | http://studentsrepo.um.edu.my/15626/1/Biao_He.pdf http://studentsrepo.um.edu.my/15626/2/He_Biao.pdf http://studentsrepo.um.edu.my/15626/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!
