Effect of cmmi-based software process maturity on software schedule estimation

The Software Capability Maturity Model (SW-CMM) has become a popular model for enhancing software development processes with the goal of developing high-quality software within budget and schedule. The software cost estimation model, COnstructive COst MOdel (COCOMO), in its last update (COCOMO II) h...

Full description

Saved in:
Bibliographic Details
Main Authors: Alyahya, M.A., Ahmad, R., Lee, S.P.
Format: Article
Language:en
Published: 2009
Subjects:
Online Access:http://eprints.um.edu.my/6832/1/EFFECT_OF_CMMI-BASED_SOFTWARE_PROCESS_MATURITY_ON_SOFTWARE_SCHEDULE_ESTIMATION.pdf
http://eprints.um.edu.my/6832/
http://www.myjurnal.my/filebank/published_article/2454/795.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1831447246880636928
author Alyahya, M.A.
Ahmad, R.
Lee, S.P.
author_facet Alyahya, M.A.
Ahmad, R.
Lee, S.P.
author_sort Alyahya, M.A.
building UM Library
collection Institutional Repository
content_provider Universiti Malaya
content_source UM Research Repository
continent Asia
country Malaysia
description The Software Capability Maturity Model (SW-CMM) has become a popular model for enhancing software development processes with the goal of developing high-quality software within budget and schedule. The software cost estimation model, COnstructive COst MOdel (COCOMO), in its last update (COCOMO II) has a set of seventeen cost drivers and a set of five scale factors. Process Maturity (PMAT) is one of the five scale factors and its ratings are based on SW-CMM. This paper investigates the impact of process maturity on software development Schedule (cycle time) by deriving a new set of COCOMO II's PMAT rating values based on the most recent version of CMM, i.e. Capability Maturity Model Integration (CMMI). The precise data for the analysis were collected from the record of 40 historical projects which spanned the range of CMMI Levels, from Level 1 (Lower half and Upper half) to Level 4, where eight data points were collected from each level. The Ideal Scale Factor (ISF) method is applied in order to withhold the effect of the COCOMO II's PMAT scale factor. All prediction accuracies evaluations were measured using PRED (.20). The study shows that the proposed model (with the new PMAT rating values) produced better schedule estimates as compared to the generic COCOMO II model's schedule estimates.
format Article
id my.um.eprints-6832
institution Universiti Malaya
language en
publishDate 2009
record_format eprints
spelling my.um.eprints-68322013-12-10T04:55:14Z http://eprints.um.edu.my/6832/ Effect of cmmi-based software process maturity on software schedule estimation Alyahya, M.A. Ahmad, R. Lee, S.P. QA76 Computer software The Software Capability Maturity Model (SW-CMM) has become a popular model for enhancing software development processes with the goal of developing high-quality software within budget and schedule. The software cost estimation model, COnstructive COst MOdel (COCOMO), in its last update (COCOMO II) has a set of seventeen cost drivers and a set of five scale factors. Process Maturity (PMAT) is one of the five scale factors and its ratings are based on SW-CMM. This paper investigates the impact of process maturity on software development Schedule (cycle time) by deriving a new set of COCOMO II's PMAT rating values based on the most recent version of CMM, i.e. Capability Maturity Model Integration (CMMI). The precise data for the analysis were collected from the record of 40 historical projects which spanned the range of CMMI Levels, from Level 1 (Lower half and Upper half) to Level 4, where eight data points were collected from each level. The Ideal Scale Factor (ISF) method is applied in order to withhold the effect of the COCOMO II's PMAT scale factor. All prediction accuracies evaluations were measured using PRED (.20). The study shows that the proposed model (with the new PMAT rating values) produced better schedule estimates as compared to the generic COCOMO II model's schedule estimates. 2009 Article PeerReviewed application/pdf en http://eprints.um.edu.my/6832/1/EFFECT_OF_CMMI-BASED_SOFTWARE_PROCESS_MATURITY_ON_SOFTWARE_SCHEDULE_ESTIMATION.pdf Alyahya, M.A. and Ahmad, R. and Lee, S.P. (2009) Effect of cmmi-based software process maturity on software schedule estimation. Malaysian Journal of Computer Science, 22 (2). pp. 121-137. ISSN 0127-9084, http://www.myjurnal.my/filebank/published_article/2454/795.pdf
spellingShingle QA76 Computer software
Alyahya, M.A.
Ahmad, R.
Lee, S.P.
Effect of cmmi-based software process maturity on software schedule estimation
title Effect of cmmi-based software process maturity on software schedule estimation
title_full Effect of cmmi-based software process maturity on software schedule estimation
title_fullStr Effect of cmmi-based software process maturity on software schedule estimation
title_full_unstemmed Effect of cmmi-based software process maturity on software schedule estimation
title_short Effect of cmmi-based software process maturity on software schedule estimation
title_sort effect of cmmi-based software process maturity on software schedule estimation
topic QA76 Computer software
url http://eprints.um.edu.my/6832/1/EFFECT_OF_CMMI-BASED_SOFTWARE_PROCESS_MATURITY_ON_SOFTWARE_SCHEDULE_ESTIMATION.pdf
http://eprints.um.edu.my/6832/
http://www.myjurnal.my/filebank/published_article/2454/795.pdf
url_provider http://eprints.um.edu.my/