A Fuzzy Hybrid GA-PSO Algorithm for Multi-Objective AGV Scheduling in FMS
An automated guided vehicle (AGV) is a mobile robot with remarkable industrial applicability for transporting materials within a manufacturing facility or a warehouse. AGV scheduling refers to the process of allocating AGVs to tasks, taking into account the cost and time of operations. Multiobjectiv...
Saved in:
| Main Authors: | , , , |
|---|---|
| Format: | Article |
| Published: |
DAAAM International Vienna
2017
|
| Subjects: | |
| Online Access: | http://eprints.um.edu.my/17661/ http://dx.doi.org/10.2507/IJSIMM16(1)5.368 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Summary: | An automated guided vehicle (AGV) is a mobile robot with remarkable industrial applicability for transporting materials within a manufacturing facility or a warehouse. AGV scheduling refers to the process of allocating AGVs to tasks, taking into account the cost and time of operations. Multiobjective scheduling is adopted in this study to acquire a more complex and combinatorial model in contrast with single objective practices. The model objectives are the makespan and number of AGVs minimization while considering the AGVs battery charge. A fuzzy hybrid GA-PSO (genetic algorithm – particle swarm optimization) algorithm was developed to optimize the model. Results have been compared with GA, PSO, and hybrid GA-PSO algorithms to explore the applicability of the algorithm developed. Model’s feasibility and the algorithms’ performance were investigated through a numerical example before and after the optimization. The model evaluation and validation was conducted through simulation via Flexsim software. The fuzzy hybrid GA-PSO surpassed the other methods, although obtaining less mean computational time was the only significant improvement over hybrid GA-PSO. |
|---|
