Estimating for roadworks using lotus 1-2-3 / Dzulkifli Mohamad
There is no business skill of more importance to construction industry than estimating. Accurate estimates are necessary to the project owner, to the design team, and to construction team. Computer has long been recognised as having great potential in the area of construction estimating. This projec...
Saved in:
| Main Author: | |
|---|---|
| Format: | Student Project |
| Language: | en |
| Published: |
1990
|
| Subjects: | |
| Online Access: | https://ir.uitm.edu.my/id/eprint/99828/1/99828.pdf https://ir.uitm.edu.my/id/eprint/99828/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Summary: | There is no business skill of more importance to construction industry than estimating. Accurate estimates are necessary to the project owner, to the design team, and to construction team. Computer has long been recognised as having great potential in the area of construction estimating. This project has a major objective to aid the reader in both the principle of roadworks estimating and its computer application using LOTUS 1-2-3 version 2.01. |
|---|
