Construction of RC pile for double storey semi-D houses / Nursyamimi Asyiqin Ahmad Nizam
Deep foundation is very important structure in the building. It role is to transmit load all the way from the roof to the firm layer underground. All the load such as live load, dead load and wind load will be transfer to the substructure. Ignoring the important of deep foundation may cause more cos...
Saved in:
| Main Author: | |
|---|---|
| Format: | Monograph |
| Language: | en |
| Published: |
Universiti Teknologi MARA, Perak
2019
|
| Subjects: | |
| Online Access: | https://ir.uitm.edu.my/id/eprint/98340/1/98340.pdf https://ir.uitm.edu.my/id/eprint/98340/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1833321251785932800 |
|---|---|
| author | Ahmad Nizam, Nursyamimi Asyiqin |
| author_facet | Ahmad Nizam, Nursyamimi Asyiqin |
| author_sort | Ahmad Nizam, Nursyamimi Asyiqin |
| building | Tun Abdul Razak Library |
| collection | Institutional Repository |
| content_provider | Universiti Teknologi Mara |
| content_source | UiTM Institutional Repository |
| continent | Asia |
| country | Malaysia |
| description | Deep foundation is very important structure in the building. It role is to transmit load all the way from the roof to the firm layer underground. All the load such as live load, dead load and wind load will be transfer to the substructure. Ignoring the important of deep foundation may cause more costs for the remedial works in the future. Therefore, main purpose of deep foundation is to avoid structure from collapse or settlement. The objective of this report is to study the method of construction Reinforcement Concrete Pile. It also focuses on how to rectify problems occur during piling work. All the broken piles were rectified by adding more piles around the area to make sure the piles able to transmit load from structure. To sump up, the proper process of driven piling and welding joint between two piles is important to avoid any consequences such as broken pile. |
| format | Monograph |
| id | my.uitm.ir-98340 |
| institution | Universiti Teknologi Mara |
| language | en |
| publishDate | 2019 |
| publisher | Universiti Teknologi MARA, Perak |
| record_format | eprints |
| spelling | my.uitm.ir-983402025-01-07T02:02:17Z https://ir.uitm.edu.my/id/eprint/98340/ Construction of RC pile for double storey semi-D houses / Nursyamimi Asyiqin Ahmad Nizam Ahmad Nizam, Nursyamimi Asyiqin House construction Deep foundation is very important structure in the building. It role is to transmit load all the way from the roof to the firm layer underground. All the load such as live load, dead load and wind load will be transfer to the substructure. Ignoring the important of deep foundation may cause more costs for the remedial works in the future. Therefore, main purpose of deep foundation is to avoid structure from collapse or settlement. The objective of this report is to study the method of construction Reinforcement Concrete Pile. It also focuses on how to rectify problems occur during piling work. All the broken piles were rectified by adding more piles around the area to make sure the piles able to transmit load from structure. To sump up, the proper process of driven piling and welding joint between two piles is important to avoid any consequences such as broken pile. Universiti Teknologi MARA, Perak 2019 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/98340/1/98340.pdf Construction of RC pile for double storey semi-D houses / Nursyamimi Asyiqin Ahmad Nizam. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted) |
| spellingShingle | House construction Ahmad Nizam, Nursyamimi Asyiqin Construction of RC pile for double storey semi-D houses / Nursyamimi Asyiqin Ahmad Nizam |
| title | Construction of RC pile for double storey semi-D houses / Nursyamimi Asyiqin Ahmad Nizam |
| title_full | Construction of RC pile for double storey semi-D houses / Nursyamimi Asyiqin Ahmad Nizam |
| title_fullStr | Construction of RC pile for double storey semi-D houses / Nursyamimi Asyiqin Ahmad Nizam |
| title_full_unstemmed | Construction of RC pile for double storey semi-D houses / Nursyamimi Asyiqin Ahmad Nizam |
| title_short | Construction of RC pile for double storey semi-D houses / Nursyamimi Asyiqin Ahmad Nizam |
| title_sort | construction of rc pile for double storey semi-d houses / nursyamimi asyiqin ahmad nizam |
| topic | House construction |
| url | https://ir.uitm.edu.my/id/eprint/98340/1/98340.pdf https://ir.uitm.edu.my/id/eprint/98340/ |
| url_provider | http://ir.uitm.edu.my/ |