Construction method of superstructure for terrace house / Wan Nurul Izzah Wan Ibrahim

This report was about the Construction Method of Superstructure for Terrace House. The objective of writing this report was to describe the construction procedures of superstructure for terrace house, identify machineries and the problems with its solutions. The method of study that had been used to...

Full description

Saved in:
Bibliographic Details
Main Author: Wan Ibrahim, Wan Nurul Izzah
Format: Monograph
Language:en
Published: Universiti Teknologi MARA, Perak 2019
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/95901/1/95901.pdf
https://ir.uitm.edu.my/id/eprint/95901/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This report was about the Construction Method of Superstructure for Terrace House. The objective of writing this report was to describe the construction procedures of superstructure for terrace house, identify machineries and the problems with its solutions. The method of study that had been used to obtain the information was by site visits, interviews and document reviews with Project Executives and main contractor at Kajang East Precint 1,37332, Semenyih, Selangor. The method for this project started with proposal followed by tendering, selection of contractor, work progress, work completion and the maintenance work. In results, the procedures had been obtained, the machineries had been identified and the problems with its solutions had been investigated easily. Finally, all of the information was to complete the report.