Permits application process for construction at Majlis Perbandaran Taiping (MPT) / Nurul Athirah Ibrahim

For every construction projects that runs within the Majlis Perbandaran Taiping jurisdiction, the contractors of the project should be responsible for the permit application for the said construction projects. This is because the permits are one of the important documents that needed to be owned by...

Full description

Saved in:
Bibliographic Details
Main Author: Ibrahim, Nurul Athirah
Format: Monograph
Language:en
Published: Universiti Teknologi MARA UiTM,Perak 2021
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/93380/1/93380.PDF
https://ir.uitm.edu.my/id/eprint/93380/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1833319961554059264
author Ibrahim, Nurul Athirah
author_facet Ibrahim, Nurul Athirah
author_sort Ibrahim, Nurul Athirah
building Tun Abdul Razak Library
collection Institutional Repository
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
continent Asia
country Malaysia
description For every construction projects that runs within the Majlis Perbandaran Taiping jurisdiction, the contractors of the project should be responsible for the permit application for the said construction projects. This is because the permits are one of the important documents that needed to be owned by the contractors in the construction duration. There are three main permits that conveys the similar uses between each of it but the permit is used for different type of construction projects. The three main permits that will be introduce in this report are construction permit, construction materials permit and small construction work permit. These permits acts as a free pass for the contractors to runs the construction albeit all situation. All of this permits are managed under the building department of this municipal council. Mr. Hisham, the head of building department along with Mr. Nizwal, Mr. Helmy and Mr. Norazmi are the one who has given the power to validate the said permit. Other than that, there are several problems that may be faced by the user of the permits regarding the permit for the construction. Nevertheless, the problems may be solved as the contractors could come to building department and seek a consultation from the related staffs. To recapitulate, this report will explain completely the steps on the way to applying the permit process as well as the its uses and problems that may rise regarding this three permits.
format Monograph
id my.uitm.ir-93380
institution Universiti Teknologi Mara
language en
publishDate 2021
publisher Universiti Teknologi MARA UiTM,Perak
record_format eprints
spelling my.uitm.ir-933802025-01-05T16:18:07Z https://ir.uitm.edu.my/id/eprint/93380/ Permits application process for construction at Majlis Perbandaran Taiping (MPT) / Nurul Athirah Ibrahim Ibrahim, Nurul Athirah Construction details. Including foundations, maintenance, equipment TH Building construction Contractors For every construction projects that runs within the Majlis Perbandaran Taiping jurisdiction, the contractors of the project should be responsible for the permit application for the said construction projects. This is because the permits are one of the important documents that needed to be owned by the contractors in the construction duration. There are three main permits that conveys the similar uses between each of it but the permit is used for different type of construction projects. The three main permits that will be introduce in this report are construction permit, construction materials permit and small construction work permit. These permits acts as a free pass for the contractors to runs the construction albeit all situation. All of this permits are managed under the building department of this municipal council. Mr. Hisham, the head of building department along with Mr. Nizwal, Mr. Helmy and Mr. Norazmi are the one who has given the power to validate the said permit. Other than that, there are several problems that may be faced by the user of the permits regarding the permit for the construction. Nevertheless, the problems may be solved as the contractors could come to building department and seek a consultation from the related staffs. To recapitulate, this report will explain completely the steps on the way to applying the permit process as well as the its uses and problems that may rise regarding this three permits. Universiti Teknologi MARA UiTM,Perak 2021 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/93380/1/93380.PDF Permits application process for construction at Majlis Perbandaran Taiping (MPT) / Nurul Athirah Ibrahim. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
spellingShingle Construction details. Including foundations, maintenance, equipment
TH Building construction
Contractors
Ibrahim, Nurul Athirah
Permits application process for construction at Majlis Perbandaran Taiping (MPT) / Nurul Athirah Ibrahim
title Permits application process for construction at Majlis Perbandaran Taiping (MPT) / Nurul Athirah Ibrahim
title_full Permits application process for construction at Majlis Perbandaran Taiping (MPT) / Nurul Athirah Ibrahim
title_fullStr Permits application process for construction at Majlis Perbandaran Taiping (MPT) / Nurul Athirah Ibrahim
title_full_unstemmed Permits application process for construction at Majlis Perbandaran Taiping (MPT) / Nurul Athirah Ibrahim
title_short Permits application process for construction at Majlis Perbandaran Taiping (MPT) / Nurul Athirah Ibrahim
title_sort permits application process for construction at majlis perbandaran taiping (mpt) / nurul athirah ibrahim
topic Construction details. Including foundations, maintenance, equipment
TH Building construction
Contractors
url https://ir.uitm.edu.my/id/eprint/93380/1/93380.PDF
https://ir.uitm.edu.my/id/eprint/93380/
url_provider http://ir.uitm.edu.my/