Installation of ceramic tiles / Nur Syuhada Suhaimi
This report briefly describes the material and equipment used and the process of construction for installation ceramic tiles. According to few times site inspection experience at a construction site. The project took three months to finish completely on the construction side of the building. The obj...
Saved in:
| Main Author: | |
|---|---|
| Format: | Monograph |
| Language: | en |
| Published: |
Universiti Teknologi MARA UiTM,Perak
2022
|
| Subjects: | |
| Online Access: | https://ir.uitm.edu.my/id/eprint/92105/1/92105.PDF https://ir.uitm.edu.my/id/eprint/92105/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1833080518278643712 |
|---|---|
| author | Suhaimi, Nur Syuhada |
| author_facet | Suhaimi, Nur Syuhada |
| author_sort | Suhaimi, Nur Syuhada |
| building | Tun Abdul Razak Library |
| collection | Institutional Repository |
| content_provider | Universiti Teknologi Mara |
| content_source | UiTM Institutional Repository |
| continent | Asia |
| country | Malaysia |
| description | This report briefly describes the material and equipment used and the process of construction for installation ceramic tiles. According to few times site inspection experience at a construction site. The project took three months to finish completely on the construction side of the building. The objective of this report is to determine the material used for installation of ceramic tiles, to identify the equipment used in the project and to describe the process in installation of ceramic tiles. In this report, there are two types of study method which is observation and interview method. Observation method is performed by do a site visit. Meanwhile, interviews were conducted with site supervisor of this project. The finding from this report is the construction for the installation of ceramic tiles is setting out, excavation of the soil, installation of the reinforcement, concrete work and installing the ceramic tiles. During this construction, changes in weather, which are sometimes bright and sometimes wet, have caused the construction process to be slightly hampered. Unfortunately, this installation of ceramic tiles successfully completed on 15 November 2021. |
| format | Monograph |
| id | my.uitm.ir-92105 |
| institution | Universiti Teknologi Mara |
| language | en |
| publishDate | 2022 |
| publisher | Universiti Teknologi MARA UiTM,Perak |
| record_format | eprints |
| spelling | my.uitm.ir-921052025-01-05T04:43:36Z https://ir.uitm.edu.my/id/eprint/92105/ Installation of ceramic tiles / Nur Syuhada Suhaimi Suhaimi, Nur Syuhada Ceramics Details in building design and construction.Including walls, roofs This report briefly describes the material and equipment used and the process of construction for installation ceramic tiles. According to few times site inspection experience at a construction site. The project took three months to finish completely on the construction side of the building. The objective of this report is to determine the material used for installation of ceramic tiles, to identify the equipment used in the project and to describe the process in installation of ceramic tiles. In this report, there are two types of study method which is observation and interview method. Observation method is performed by do a site visit. Meanwhile, interviews were conducted with site supervisor of this project. The finding from this report is the construction for the installation of ceramic tiles is setting out, excavation of the soil, installation of the reinforcement, concrete work and installing the ceramic tiles. During this construction, changes in weather, which are sometimes bright and sometimes wet, have caused the construction process to be slightly hampered. Unfortunately, this installation of ceramic tiles successfully completed on 15 November 2021. Universiti Teknologi MARA UiTM,Perak 2022 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/92105/1/92105.PDF Installation of ceramic tiles / Nur Syuhada Suhaimi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. |
| spellingShingle | Ceramics Details in building design and construction.Including walls, roofs Suhaimi, Nur Syuhada Installation of ceramic tiles / Nur Syuhada Suhaimi |
| title | Installation of ceramic tiles / Nur Syuhada Suhaimi |
| title_full | Installation of ceramic tiles / Nur Syuhada Suhaimi |
| title_fullStr | Installation of ceramic tiles / Nur Syuhada Suhaimi |
| title_full_unstemmed | Installation of ceramic tiles / Nur Syuhada Suhaimi |
| title_short | Installation of ceramic tiles / Nur Syuhada Suhaimi |
| title_sort | installation of ceramic tiles / nur syuhada suhaimi |
| topic | Ceramics Details in building design and construction.Including walls, roofs |