Installation of ceramic tiles / Nur Syuhada Suhaimi

This report briefly describes the material and equipment used and the process of construction for installation ceramic tiles. According to few times site inspection experience at a construction site. The project took three months to finish completely on the construction side of the building. The obj...

Full description

Saved in:
Bibliographic Details
Main Author: Suhaimi, Nur Syuhada
Format: Monograph
Language:en
Published: Universiti Teknologi MARA UiTM,Perak 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/92105/1/92105.PDF
https://ir.uitm.edu.my/id/eprint/92105/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1833080518278643712
author Suhaimi, Nur Syuhada
author_facet Suhaimi, Nur Syuhada
author_sort Suhaimi, Nur Syuhada
building Tun Abdul Razak Library
collection Institutional Repository
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
continent Asia
country Malaysia
description This report briefly describes the material and equipment used and the process of construction for installation ceramic tiles. According to few times site inspection experience at a construction site. The project took three months to finish completely on the construction side of the building. The objective of this report is to determine the material used for installation of ceramic tiles, to identify the equipment used in the project and to describe the process in installation of ceramic tiles. In this report, there are two types of study method which is observation and interview method. Observation method is performed by do a site visit. Meanwhile, interviews were conducted with site supervisor of this project. The finding from this report is the construction for the installation of ceramic tiles is setting out, excavation of the soil, installation of the reinforcement, concrete work and installing the ceramic tiles. During this construction, changes in weather, which are sometimes bright and sometimes wet, have caused the construction process to be slightly hampered. Unfortunately, this installation of ceramic tiles successfully completed on 15 November 2021.
format Monograph
id my.uitm.ir-92105
institution Universiti Teknologi Mara
language en
publishDate 2022
publisher Universiti Teknologi MARA UiTM,Perak
record_format eprints
spelling my.uitm.ir-921052025-01-05T04:43:36Z https://ir.uitm.edu.my/id/eprint/92105/ Installation of ceramic tiles / Nur Syuhada Suhaimi Suhaimi, Nur Syuhada Ceramics Details in building design and construction.Including walls, roofs This report briefly describes the material and equipment used and the process of construction for installation ceramic tiles. According to few times site inspection experience at a construction site. The project took three months to finish completely on the construction side of the building. The objective of this report is to determine the material used for installation of ceramic tiles, to identify the equipment used in the project and to describe the process in installation of ceramic tiles. In this report, there are two types of study method which is observation and interview method. Observation method is performed by do a site visit. Meanwhile, interviews were conducted with site supervisor of this project. The finding from this report is the construction for the installation of ceramic tiles is setting out, excavation of the soil, installation of the reinforcement, concrete work and installing the ceramic tiles. During this construction, changes in weather, which are sometimes bright and sometimes wet, have caused the construction process to be slightly hampered. Unfortunately, this installation of ceramic tiles successfully completed on 15 November 2021. Universiti Teknologi MARA UiTM,Perak 2022 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/92105/1/92105.PDF Installation of ceramic tiles / Nur Syuhada Suhaimi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
spellingShingle Ceramics
Details in building design and construction.Including walls, roofs
Suhaimi, Nur Syuhada
Installation of ceramic tiles / Nur Syuhada Suhaimi
title Installation of ceramic tiles / Nur Syuhada Suhaimi
title_full Installation of ceramic tiles / Nur Syuhada Suhaimi
title_fullStr Installation of ceramic tiles / Nur Syuhada Suhaimi
title_full_unstemmed Installation of ceramic tiles / Nur Syuhada Suhaimi
title_short Installation of ceramic tiles / Nur Syuhada Suhaimi
title_sort installation of ceramic tiles / nur syuhada suhaimi
topic Ceramics
Details in building design and construction.Including walls, roofs
url https://ir.uitm.edu.my/id/eprint/92105/1/92105.PDF
https://ir.uitm.edu.my/id/eprint/92105/
url_provider http://ir.uitm.edu.my/