Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi

This paper studies the protective relay setting and coordination using PSS-Adept. Faults and failures normally occur in power system. Power system needs an auxiliary system that must take corrective action on the occurrence of a fault. This auxiliary system is knows as protection system. Protection...

Full description

Saved in:
Bibliographic Details
Main Author: Azmi, Musafri Abdullah
Format: Article
Language:en
Published: 2010
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/84132/1/84132.pdf
https://ir.uitm.edu.my/id/eprint/84132/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1833078398467964928
author Azmi, Musafri Abdullah
author_facet Azmi, Musafri Abdullah
author_sort Azmi, Musafri Abdullah
building Tun Abdul Razak Library
collection Institutional Repository
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
continent Asia
country Malaysia
description This paper studies the protective relay setting and coordination using PSS-Adept. Faults and failures normally occur in power system. Power system needs an auxiliary system that must take corrective action on the occurrence of a fault. This auxiliary system is knows as protection system. Protection systems are sets of equipments to detect faults in the protected elements of the power systems, to disconnect the faulted element and to re-establish the service. This paper approach for over current and earth fault as protection system. Protective device coordination is the process of determining the best timing of current interruption when abnormal electrical conditions occur. This paper also using Bus power system distribution network and implement using protection equipment application in power system simulation programmed for planning, design and analysis of distributed system (PSS/Adept).This paper conclude by the result of study carried out O!! analysis protective relays configuration.
format Article
id my.uitm.ir-84132
institution Universiti Teknologi Mara
language en
publishDate 2010
record_format eprints
spelling my.uitm.ir-841322024-11-26T07:52:45Z https://ir.uitm.edu.my/id/eprint/84132/ Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi Azmi, Musafri Abdullah Electric power distribution. Electric power transmission This paper studies the protective relay setting and coordination using PSS-Adept. Faults and failures normally occur in power system. Power system needs an auxiliary system that must take corrective action on the occurrence of a fault. This auxiliary system is knows as protection system. Protection systems are sets of equipments to detect faults in the protected elements of the power systems, to disconnect the faulted element and to re-establish the service. This paper approach for over current and earth fault as protection system. Protective device coordination is the process of determining the best timing of current interruption when abnormal electrical conditions occur. This paper also using Bus power system distribution network and implement using protection equipment application in power system simulation programmed for planning, design and analysis of distributed system (PSS/Adept).This paper conclude by the result of study carried out O!! analysis protective relays configuration. 2010 Article PeerReviewed text en https://ir.uitm.edu.my/id/eprint/84132/1/84132.pdf Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi. (2010) pp. 1-5.
spellingShingle Electric power distribution. Electric power transmission
Azmi, Musafri Abdullah
Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi
title Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi
title_full Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi
title_fullStr Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi
title_full_unstemmed Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi
title_short Overcurrent and earth fault relay setting and coordination using PSS-Adept : article / Musafri Abdullah Azmi
title_sort overcurrent and earth fault relay setting and coordination using pss-adept : article / musafri abdullah azmi
topic Electric power distribution. Electric power transmission
url https://ir.uitm.edu.my/id/eprint/84132/1/84132.pdf
https://ir.uitm.edu.my/id/eprint/84132/
url_provider http://ir.uitm.edu.my/