The construction process of strip footing for 465 units single storey house / Mohammad Nazirul Mubin Mohd Rasfan

Substructure is one of the important things to be considered in construction process. Therefore, this report will discuss about substructure works based on Energiser Enterprise Sdn. Bhd. Specification. This report is conducted at Cadangan Pembangunan Secara Usahasama Program Khas Perumahan Perwira N...

Full description

Saved in:
Bibliographic Details
Main Author: Mohd Rasfan, Mohammad Nazirul Mubin
Format: Monograph
Language:en
Published: Universiti Teknologi MARA, Perak 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/83929/2/83929.PDF
https://ir.uitm.edu.my/id/eprint/83929/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Substructure is one of the important things to be considered in construction process. Therefore, this report will discuss about substructure works based on Energiser Enterprise Sdn. Bhd. Specification. This report is conducted at Cadangan Pembangunan Secara Usahasama Program Khas Perumahan Perwira Negeri Perak (PKPPNP) Di Atas Lot 11523, Lot 11530 Dan Sebahagian Lot 10940 (Tanah Kerajaan), Mukim Bota, Daerah Perak Tengah, Perak Darul Ridzuan. The objective of this report is to study the construction method of strip footing. This report focused on all works related to concreting works and all the machineries and equipment used. This report also looks at the problems occurred during construction and their solutions. The strength of substructure is important for long term to make sure the building structure does not collapse, and all the load is properly distributed to the ground.