Project handover: On proposed design, construction, completion, commissioning of Mahallah LTAT at the International Islamic University Malaysia, Gombak, Selangor Darul Ehsan / Mohamad Hairul Asri Jamaludin

Handover is a very important element to elaborate, therefore this report will discuss about project handing over for the building. This report was conducted for the building hostel Lembaga Tabung Angkatan Tentera (LTA T) at UIA, Gombak. The objective of this report is to know what, and how it is pro...

Full description

Saved in:
Bibliographic Details
Main Author: Asri Jamaludin, Mohamad Hairul
Format: Monograph
Language:en
Published: Universiti Teknologi MARA, Perak 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/80196/1/80196.pdf
https://ir.uitm.edu.my/id/eprint/80196/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1833077340499869696
author Asri Jamaludin, Mohamad Hairul
author_facet Asri Jamaludin, Mohamad Hairul
author_sort Asri Jamaludin, Mohamad Hairul
building Tun Abdul Razak Library
collection Institutional Repository
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
continent Asia
country Malaysia
description Handover is a very important element to elaborate, therefore this report will discuss about project handing over for the building. This report was conducted for the building hostel Lembaga Tabung Angkatan Tentera (LTA T) at UIA, Gombak. The objective of this report is to know what, and how it is project hand over. It will focus on, this three segments which are before, during, and after for these project hand over. To illustrate the function of project hand over of building as an important aspect to focus on documentation and then to evaluate how far the potential of the building hand over that could fulfill the building criteria that is prescribes by the standard building requirements in the guideline. This report will also look at the project hand over management based on the guideline by producing the use of effective and to evaluate the quality to hand over project.
format Monograph
id my.uitm.ir-80196
institution Universiti Teknologi Mara
language en
publishDate 2015
publisher Universiti Teknologi MARA, Perak
record_format eprints
spelling my.uitm.ir-801962025-01-20T17:19:56Z https://ir.uitm.edu.my/id/eprint/80196/ Project handover: On proposed design, construction, completion, commissioning of Mahallah LTAT at the International Islamic University Malaysia, Gombak, Selangor Darul Ehsan / Mohamad Hairul Asri Jamaludin Asri Jamaludin, Mohamad Hairul Details in building design and construction.Including walls, roofs Handover is a very important element to elaborate, therefore this report will discuss about project handing over for the building. This report was conducted for the building hostel Lembaga Tabung Angkatan Tentera (LTA T) at UIA, Gombak. The objective of this report is to know what, and how it is project hand over. It will focus on, this three segments which are before, during, and after for these project hand over. To illustrate the function of project hand over of building as an important aspect to focus on documentation and then to evaluate how far the potential of the building hand over that could fulfill the building criteria that is prescribes by the standard building requirements in the guideline. This report will also look at the project hand over management based on the guideline by producing the use of effective and to evaluate the quality to hand over project. Universiti Teknologi MARA, Perak 2015 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/80196/1/80196.pdf Project handover: On proposed design, construction, completion, commissioning of Mahallah LTAT at the International Islamic University Malaysia, Gombak, Selangor Darul Ehsan / Mohamad Hairul Asri Jamaludin. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
spellingShingle Details in building design and construction.Including walls, roofs
Asri Jamaludin, Mohamad Hairul
Project handover: On proposed design, construction, completion, commissioning of Mahallah LTAT at the International Islamic University Malaysia, Gombak, Selangor Darul Ehsan / Mohamad Hairul Asri Jamaludin
title Project handover: On proposed design, construction, completion, commissioning of Mahallah LTAT at the International Islamic University Malaysia, Gombak, Selangor Darul Ehsan / Mohamad Hairul Asri Jamaludin
title_full Project handover: On proposed design, construction, completion, commissioning of Mahallah LTAT at the International Islamic University Malaysia, Gombak, Selangor Darul Ehsan / Mohamad Hairul Asri Jamaludin
title_fullStr Project handover: On proposed design, construction, completion, commissioning of Mahallah LTAT at the International Islamic University Malaysia, Gombak, Selangor Darul Ehsan / Mohamad Hairul Asri Jamaludin
title_full_unstemmed Project handover: On proposed design, construction, completion, commissioning of Mahallah LTAT at the International Islamic University Malaysia, Gombak, Selangor Darul Ehsan / Mohamad Hairul Asri Jamaludin
title_short Project handover: On proposed design, construction, completion, commissioning of Mahallah LTAT at the International Islamic University Malaysia, Gombak, Selangor Darul Ehsan / Mohamad Hairul Asri Jamaludin
title_sort project handover: on proposed design, construction, completion, commissioning of mahallah ltat at the international islamic university malaysia, gombak, selangor darul ehsan / mohamad hairul asri jamaludin
topic Details in building design and construction.Including walls, roofs
url https://ir.uitm.edu.my/id/eprint/80196/1/80196.pdf
https://ir.uitm.edu.my/id/eprint/80196/
url_provider http://ir.uitm.edu.my/