Testing and commisioning of GIS switchgear for high voltage substation / Mohd Zulkifli Mat Ghani

This project presents a testing and commissioning of high voltage substation. The project focus on Gas Insulated Switchgear (GIS) is come out and the result of testing obtained are compared with Air Insulated Switchgear (AIS). The study and testing is carried out at Bukit Raja substation for GIS and...

Full description

Saved in:
Bibliographic Details
Main Author: Mat Ghani, Mohd Zulkifli
Format: Thesis
Language:en
Published: 2003
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/77935/1/77935.pdf
https://ir.uitm.edu.my/id/eprint/77935/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This project presents a testing and commissioning of high voltage substation. The project focus on Gas Insulated Switchgear (GIS) is come out and the result of testing obtained are compared with Air Insulated Switchgear (AIS). The study and testing is carried out at Bukit Raja substation for GIS and Tanah Merah for AIS. The testing focus at primary side includes busbar, switchgear and Transformer. The testing includes busbar, switchgear and transformer. The testing to make sure all equipment can be operate and safe for used. In this project, we can see protection of GIS substation comparison with AIS substation.