Caisson construction / Amirul Syafiq Zainal Abidin

Excavated caisson is among the conventional method which slightly use machinery and more on labour. Excavated caisson is familiar foundation used in this country and there was many types of caisson use in this world depending on the soil factor to be considered. This report explained the process dur...

Full description

Saved in:
Bibliographic Details
Main Author: Zainal Abidin, Amirul Syafiq
Format: Monograph
Language:en
Published: Universiti Teknologi MARA, Perak 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/77720/1/77720.pdf
https://ir.uitm.edu.my/id/eprint/77720/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1833076656628039680
author Zainal Abidin, Amirul Syafiq
author_facet Zainal Abidin, Amirul Syafiq
author_sort Zainal Abidin, Amirul Syafiq
building Tun Abdul Razak Library
collection Institutional Repository
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
continent Asia
country Malaysia
description Excavated caisson is among the conventional method which slightly use machinery and more on labour. Excavated caisson is familiar foundation used in this country and there was many types of caisson use in this world depending on the soil factor to be considered. This report explained the process during the construction of excavated caisson and other test involved in order to ensure the granite is pass the engineering requirements before start to install the reinforcement and concrete. This report will show the process and method to construct the excavated caisson. So the construction of excavated caisson is the most crucial part of the structure because to receive such massive load from live and dead load of the structure to give strength to the foundation to support the loads.
format Monograph
id my.uitm.ir-77720
institution Universiti Teknologi Mara
language en
publishDate 2015
publisher Universiti Teknologi MARA, Perak
record_format eprints
spelling my.uitm.ir-777202025-01-20T17:17:32Z https://ir.uitm.edu.my/id/eprint/77720/ Caisson construction / Amirul Syafiq Zainal Abidin Zainal Abidin, Amirul Syafiq Construction equipment in building Excavated caisson is among the conventional method which slightly use machinery and more on labour. Excavated caisson is familiar foundation used in this country and there was many types of caisson use in this world depending on the soil factor to be considered. This report explained the process during the construction of excavated caisson and other test involved in order to ensure the granite is pass the engineering requirements before start to install the reinforcement and concrete. This report will show the process and method to construct the excavated caisson. So the construction of excavated caisson is the most crucial part of the structure because to receive such massive load from live and dead load of the structure to give strength to the foundation to support the loads. Universiti Teknologi MARA, Perak 2015 Monograph NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/77720/1/77720.pdf Caisson construction / Amirul Syafiq Zainal Abidin. (2015) Industrial Training. Universiti Teknologi MARA, Perak. <http://terminalib.uitm.edu.my/77720.pdf> (Submitted)
spellingShingle Construction equipment in building
Zainal Abidin, Amirul Syafiq
Caisson construction / Amirul Syafiq Zainal Abidin
title Caisson construction / Amirul Syafiq Zainal Abidin
title_full Caisson construction / Amirul Syafiq Zainal Abidin
title_fullStr Caisson construction / Amirul Syafiq Zainal Abidin
title_full_unstemmed Caisson construction / Amirul Syafiq Zainal Abidin
title_short Caisson construction / Amirul Syafiq Zainal Abidin
title_sort caisson construction / amirul syafiq zainal abidin
topic Construction equipment in building
url https://ir.uitm.edu.my/id/eprint/77720/1/77720.pdf
https://ir.uitm.edu.my/id/eprint/77720/
url_provider http://ir.uitm.edu.my/