A procedural framework for extension of time (EoT) claim settlement in the Malaysian construction industry / Norazian Mohamad Yusuwan

The construction industry is often burdened by various problems associated with contractual claims that affect not only the administration and management of projects but also disrupt the smooth running of construction activities as well as contribute to the occurrence of disputes between the parties...

Full description

Saved in:
Bibliographic Details
Main Author: Mohamad Yusuwan, Norazian
Format: Book Section
Language:en
Published: Institute of Graduate Studies, UiTM 2017
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/19792/1/ABS_NOR%20AZWAN%20MOHAMED%20KAMARI%20TDRA%20VOL%2011%20IGS%2017.pdf
https://ir.uitm.edu.my/id/eprint/19792/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1833060675649273856
author Mohamad Yusuwan, Norazian
author_facet Mohamad Yusuwan, Norazian
author_sort Mohamad Yusuwan, Norazian
building Tun Abdul Razak Library
collection Institutional Repository
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
continent Asia
country Malaysia
description The construction industry is often burdened by various problems associated with contractual claims that affect not only the administration and management of projects but also disrupt the smooth running of construction activities as well as contribute to the occurrence of disputes between the parties involved. Such disputes will affect harmonious relationships among industry players if they are not tackled in the best possible way. Despite the many studies that have been carried out with regard to improving the management of contract claims, yet very little research has been conducted to address the issue in relation to the extension of time (EoT) claim, specifically as to what constitutes a good EoT claim and the possible measures that can be taken by industry players towards the successful settlement of an EoT claim. Therefore, this study was undertaken with the aim of developing an appropriate framework that can help the parties involved in the construction industry to come up with EoT claims that can be resolved harmoniously without any unnecessary disputes. Prior to the development of such a framework, the practices of industry players in dealing with EoT claims were investigated, contentious issues in relation to EoT claims and the reasons for the rejection of such claims were revealed, and the success elements for EoT claims and initiatives to reduce the likelihood of failure of such claims were identified. The triangulation method comprised of a questionnaire survey, semi-structured interviews and a modified Delphi approach, was employed to achieve the research objectives…
format Book Section
id my.uitm.ir-19792
institution Universiti Teknologi Mara
language en
publishDate 2017
publisher Institute of Graduate Studies, UiTM
record_format eprints
spelling my.uitm.ir-197922018-06-08T00:52:00Z https://ir.uitm.edu.my/id/eprint/19792/ A procedural framework for extension of time (EoT) claim settlement in the Malaysian construction industry / Norazian Mohamad Yusuwan Mohamad Yusuwan, Norazian Malaysia The construction industry is often burdened by various problems associated with contractual claims that affect not only the administration and management of projects but also disrupt the smooth running of construction activities as well as contribute to the occurrence of disputes between the parties involved. Such disputes will affect harmonious relationships among industry players if they are not tackled in the best possible way. Despite the many studies that have been carried out with regard to improving the management of contract claims, yet very little research has been conducted to address the issue in relation to the extension of time (EoT) claim, specifically as to what constitutes a good EoT claim and the possible measures that can be taken by industry players towards the successful settlement of an EoT claim. Therefore, this study was undertaken with the aim of developing an appropriate framework that can help the parties involved in the construction industry to come up with EoT claims that can be resolved harmoniously without any unnecessary disputes. Prior to the development of such a framework, the practices of industry players in dealing with EoT claims were investigated, contentious issues in relation to EoT claims and the reasons for the rejection of such claims were revealed, and the success elements for EoT claims and initiatives to reduce the likelihood of failure of such claims were identified. The triangulation method comprised of a questionnaire survey, semi-structured interviews and a modified Delphi approach, was employed to achieve the research objectives… Institute of Graduate Studies, UiTM 2017 Book Section PeerReviewed text en https://ir.uitm.edu.my/id/eprint/19792/1/ABS_NOR%20AZWAN%20MOHAMED%20KAMARI%20TDRA%20VOL%2011%20IGS%2017.pdf A procedural framework for extension of time (EoT) claim settlement in the Malaysian construction industry / Norazian Mohamad Yusuwan. (2017) In: The Doctoral Research Abstracts. Professorial Lecture, 11 (11). Institute of Graduate Studies, UiTM, Shah Alam.
spellingShingle Malaysia
Mohamad Yusuwan, Norazian
A procedural framework for extension of time (EoT) claim settlement in the Malaysian construction industry / Norazian Mohamad Yusuwan
title A procedural framework for extension of time (EoT) claim settlement in the Malaysian construction industry / Norazian Mohamad Yusuwan
title_full A procedural framework for extension of time (EoT) claim settlement in the Malaysian construction industry / Norazian Mohamad Yusuwan
title_fullStr A procedural framework for extension of time (EoT) claim settlement in the Malaysian construction industry / Norazian Mohamad Yusuwan
title_full_unstemmed A procedural framework for extension of time (EoT) claim settlement in the Malaysian construction industry / Norazian Mohamad Yusuwan
title_short A procedural framework for extension of time (EoT) claim settlement in the Malaysian construction industry / Norazian Mohamad Yusuwan
title_sort procedural framework for extension of time (eot) claim settlement in the malaysian construction industry / norazian mohamad yusuwan
topic Malaysia
url https://ir.uitm.edu.my/id/eprint/19792/1/ABS_NOR%20AZWAN%20MOHAMED%20KAMARI%20TDRA%20VOL%2011%20IGS%2017.pdf
https://ir.uitm.edu.my/id/eprint/19792/
url_provider http://ir.uitm.edu.my/