Defect study during defect liability period / Mohd Asrul Hassin

Malaysia is one the fastest growing developing nation in the region and the world. In order to remain at pace, the government had planned and budgeted billions of Ringgit to ensure the flow of projects in Malaysia. From the report and the problem statement in the newly completed project, government...

Full description

Saved in:
Bibliographic Details
Main Author: Hassin, Mohd Asrul
Format: Thesis
Language:en
Published: 2010
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/15542/1/TD_MOHD%20ASRUL%20HASSIN%20AP%2010_5.pdf
https://ir.uitm.edu.my/id/eprint/15542/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1833059455776849920
author Hassin, Mohd Asrul
author_facet Hassin, Mohd Asrul
author_sort Hassin, Mohd Asrul
building Tun Abdul Razak Library
collection Institutional Repository
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
continent Asia
country Malaysia
description Malaysia is one the fastest growing developing nation in the region and the world. In order to remain at pace, the government had planned and budgeted billions of Ringgit to ensure the flow of projects in Malaysia. From the report and the problem statement in the newly completed project, government made the modification in the practice the Defect Liability Period. Government extended from the normal Defect Liability Period 12 months to 24 months. The reason why government extended the Defect Liability Period because to give the opportunity to clients or building owner make the report on the defect occur in their building. A study was conducted to identify the types o f defect, categories o f defect and how critical o f defects occurred during Defect Liability Period. A total o f 50 questionnaires were distributed to contractor, consultant, developer and building owner. The study indicated that defects are due to faulty design, faulty construction, faulty material and faulty use. The 4 groups o f defects mentioned above are main causes o f defects. The most group critical o f defect is faulty use in questionnaire result. Conditionsurvey indicated the faulty construction is the higher critical o f defects occurred during Defect Liability Period.
format Thesis
id my.uitm.ir-15542
institution Universiti Teknologi Mara
language en
publishDate 2010
record_format eprints
spelling my.uitm.ir-155422016-11-21T07:02:26Z https://ir.uitm.edu.my/id/eprint/15542/ Defect study during defect liability period / Mohd Asrul Hassin Hassin, Mohd Asrul Building failures, errors, defects, etc. Malaysia is one the fastest growing developing nation in the region and the world. In order to remain at pace, the government had planned and budgeted billions of Ringgit to ensure the flow of projects in Malaysia. From the report and the problem statement in the newly completed project, government made the modification in the practice the Defect Liability Period. Government extended from the normal Defect Liability Period 12 months to 24 months. The reason why government extended the Defect Liability Period because to give the opportunity to clients or building owner make the report on the defect occur in their building. A study was conducted to identify the types o f defect, categories o f defect and how critical o f defects occurred during Defect Liability Period. A total o f 50 questionnaires were distributed to contractor, consultant, developer and building owner. The study indicated that defects are due to faulty design, faulty construction, faulty material and faulty use. The 4 groups o f defects mentioned above are main causes o f defects. The most group critical o f defect is faulty use in questionnaire result. Conditionsurvey indicated the faulty construction is the higher critical o f defects occurred during Defect Liability Period. 2010 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/15542/1/TD_MOHD%20ASRUL%20HASSIN%20AP%2010_5.pdf Defect study during defect liability period / Mohd Asrul Hassin. (2010) Degree thesis, thesis, Universiti Teknologi MARA. <http://terminalib.uitm.edu.my/15542.pdf>
spellingShingle Building failures, errors, defects, etc.
Hassin, Mohd Asrul
Defect study during defect liability period / Mohd Asrul Hassin
title Defect study during defect liability period / Mohd Asrul Hassin
title_full Defect study during defect liability period / Mohd Asrul Hassin
title_fullStr Defect study during defect liability period / Mohd Asrul Hassin
title_full_unstemmed Defect study during defect liability period / Mohd Asrul Hassin
title_short Defect study during defect liability period / Mohd Asrul Hassin
title_sort defect study during defect liability period / mohd asrul hassin
topic Building failures, errors, defects, etc.
url https://ir.uitm.edu.my/id/eprint/15542/1/TD_MOHD%20ASRUL%20HASSIN%20AP%2010_5.pdf
https://ir.uitm.edu.my/id/eprint/15542/
url_provider http://ir.uitm.edu.my/