ENT300: general guidelines for operational plan part 3

List of machineries and equipment. Number of machineries and equipment needed must be calculated using a formula in order to make sure it is enough to cover the production. The price of these machineries and equipment must not be made based on assumptions. A survey should be carried out to get the a...

Full description

Saved in:
Bibliographic Details
Main Authors: Kamaludin, Mohd Ariff, Nik Jaafar, Nik Fazlin Hiryati, Nik Hassan, Nik Fakrulhazri, Ibrahim, Norlaila
Format: Monograph
Language:en
Published: Fakulti Pengurusan Perniagaan, UiTM Terengganu 2022
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/129285/1/129285.pdf
https://ir.uitm.edu.my/id/eprint/129285/
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items