The construction process of precast reinforced concrete of frame structure for Industrialised Building System (IBS) / Muhammad Aminuddin Kamarul Zaman

This report briefly described the construction process of precast reinforced concrete (PRC) frame structure focused on beam components. To achieve aimed of this report, two objectives were carried to determine the construction process of precast reinforced concrete of frame structure for IBS that fo...

Full description

Saved in:
Bibliographic Details
Main Author: Kamarul Zaman, Muhammad Aminuddin
Format: Monograph
Language:en
Published: Universiti Teknologi MARA, Perak 2019
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/100536/1/100536.pdf
https://ir.uitm.edu.my/id/eprint/100536/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This report briefly described the construction process of precast reinforced concrete (PRC) frame structure focused on beam components. To achieve aimed of this report, two objectives were carried to determine the construction process of precast reinforced concrete of frame structure for IBS that focused on precast RC beams components. The construction work process was deliberated in production, transportation and installation aspects. On the other hand, problems and solution during the process of precast RC beams was also explained. The results revealed that the production, transportation and installation work process of precast reinforcement concrete beam for industrialised building system have been determined. Moreover, the problems and solutions occurred on site have been identify. In conclusion, by implement the IBS in construction nowadays, it can give better quality environment, rapid construction period and reduced waste in a large amount compared to the conventional construction method.