Automated Bricklaying Robot (ABR-1) / Syaima Mohd Fauzi and Ezzat Fahmi Ahmad
In Malaysia, the conventional method is still widely used, though the Industrialised Building System (IBS) has been successfully adopted in the government sector. Malaysia’s construction industry needs more workers as conventional methods are widely used. Right now, the Malaysian construction indust...
Saved in:
| Main Authors: | , |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | en |
| Published: |
2023
|
| Subjects: | |
| Online Access: | https://ir.uitm.edu.my/id/eprint/100162/1/100162.pdf https://ir.uitm.edu.my/id/eprint/100162/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
