Community awareness on the implementation of early warning system at Tenaga Nasional Berhad Sultan Abu Bakar hydroelectric scheme, Lembah Bertam, Cameron Highland

This article presents the community awareness on the implementation of Early Warning System (EWS) in a well-planned Integrated Community-Based Disaster Management (ICBDM) that covers all Tenaga Nasional Berhad’s (TNB) hydroelectric schemes. In Cameron Highland, Lembah Bertam and further downstre...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohd. Hussain, Mohd. Ramzi, Zen, Ismawi, Sabri Muda, Rahsidi, Thiruchelvam, Sivadass, Tukiman, Izawati, Ahmad Shazili, Aishah Naqiah
Format: Article
Language:en
en
Published: Planning Malaysia 2018
Subjects:
Online Access:http://irep.iium.edu.my/65459/1/MIP%20Journal%20Paper%20Ramzi%20et%20al.%2C%202018.pdf
http://irep.iium.edu.my/65459/7/65459_COMMUNITY%20AWARENESS%20ON%20THE%20IMPLEMENTATION_scopus.pdf
http://irep.iium.edu.my/65459/
http://www.planningmalaysia.org/index.php/pmj/article/view/419
Tags: Add Tag
No Tags, Be the first to tag this record!